Laserfiche WebLink
on the cover sheet . The cover sheet shall fully describe the packaged data and include a <br /> listing of all items within the package . Provide to the Resident Project Representative a <br /> copy of each transmittal sheet for shop drawings , product data and samples at the time of <br /> submittal to the Engineer . <br /> C . The Contractor shall utilize the following Shop Drawing numbering system : <br /> 1 . The Submittal Log Number shall reference the Specification Section Number . <br /> 2 . The numbering system shall be specification section number followed by a " I " for <br /> original submittal , " I A " for first resubmittal and so forth , (for example : 15050 - 1 , <br /> 15050 - 1A , 15050 - 113 . 60 ) <br /> D . Notify the Engineer in writing, at the time of submittal , of any deviations in the submittals <br /> from the requirements of the Contract Documents . <br /> E . The review and approval of shop drawings , samples or product data by the Engineer shall <br /> not relieve the Contractor from the responsibility for the fulfillment of the terms of the <br /> Contract. All risks of error and omission are assumed by the Contractor and the Engineer <br /> will have no responsibility therefor. <br /> F . No portion of the work requiring a shop drawing, sample, or product data shall be started <br /> nor shall any materials be fabricated or installed prior to the approval or qualified approval <br /> of such item . Fabrication performed , materials purchased or on -site construction <br /> accomplished which does not conform to approved shop drawings and data shall be at the <br /> Contractor' s risk. Tile Owner will not be liable for any expense or delay due to corrections <br /> or remedies required to accomplish conformity . <br /> G . Project work, materials , fabrication , and installation shall conform with approved shop <br /> drawings , applicable samples , and product data. <br /> 1 . 04 SUBMISSION REQUIREMENTS <br /> A . Make submittals promptly in accordance with approved schedule and in such sequence as <br /> to cause no delay in the Work or in the work of any other contractor . <br /> B . Each submittal , appropriately coded , will be returned within 30 calendar days following <br /> receipt of submittal by the Engineer . <br /> C . Number of submittals required : <br /> 1 . Shop Drawings : Submit the number of opaque reproductions which the contractor <br /> requires , plus five (5 ) copies which will be retained by the Engineer . <br /> 2 . Product Data : Submit the number of copies which the Contractor requires , plus five <br /> (5 ) copies which will be retained by the Engineer . <br /> 3 . Samples : Submit the number stated in the respective Sections . <br /> D . Submittals shall contain : <br /> 1 . The date of submission and the dates of any previous submissions . <br /> 2 . The Project title and number . <br /> 3 . Contractor identification . <br /> 4 . The names of: <br /> a. Contractor <br /> 01340 -3 <br />