My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . When project is alteration and additional work, DO NOT use materials <br /> and equipment removed from existing structure , except as specifically <br /> allowed by notation or indication by Contract Documents . <br /> 1 . 04 WORKMANSHIP <br /> A . Comply with industry standards except when more restrictive <br /> tolerances or specified requirements indicate more rigid standards or <br /> more precise workmanship . <br /> B . Perform work by persons qualified to produce workmanship of specified <br /> quality . <br /> C . Secure products in place with positive anchorage devises designed and <br /> sized to withstand stresses , vibration , and rocking . <br /> 1 . 05 MANUFACTURER ' S INSTRUCTIONS <br /> A . When work is specified to comply with manufacturer' s printed <br /> instructions , obtain and distribute copies to persons involved , and <br /> maintain one set at job site in field office . <br /> B . Perform work in accordance with manufacturer' s instructions and <br /> specified requirements . <br /> C . Should a conflict exist between Specifications and manufacturer' s <br /> instructions, consult with Engineer . <br /> 1 . 06 TRANSPORTATION AND HANDLING <br /> A . Arrange deliveries of products in accordance with construction <br /> schedules; coordinate to avoid delay of progress, conflict with work and <br /> with conditions at the site . <br /> B . Transport products by methods to avoid product damage ; deliver in <br /> undamaged condition in manufacturer' s unopened containers or <br /> packaging, dry . <br /> C . Provide equipment and personnel to handle product by methods to <br /> prevent soiling or damage . <br /> D . Promptly inspect shipments to assure that products comply with <br /> requirements, quantities are correct and products are undamaged . <br /> 01600 Material and Equipment Reuse Automation <br /> 01600 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.