My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 07 STORAGE AND PROTECTION <br /> A . Store products in accordance with manufacturer' s instructions, with <br /> seals and labels intact and legible . <br /> B . Store sensitive products in weather-tight enclosures ; maintain within <br /> temperatures and humidity ranges recommended / required by <br /> manufacturer' s instructions . <br /> C . For exterior storage of fabricated products, place on sloped supports <br /> above ground . Cover products subject to deterioration with impervious <br /> sheet covering ; provide ventilation to avoid condensation . <br /> D . Store loose granular materials on solid surfaces in a well - drained area ; <br /> prevent mixing with foreign matter . <br /> E . Arrange storage to provide access for inspection . Periodically inspect to <br /> assure products are undamaged , and are maintained under required <br /> conditions . <br /> F . After installation , provide coverings to protect products from damage <br /> from traffic and construction operations, remove when no longer <br /> needed . <br /> 1 . 08 PRODUCT OPTIONS <br /> A . Within 30 days after date of Contract, submit complete list of major <br /> products proposed , with name of manufacturer, trade name and model . <br /> B . Options : <br /> 1 . Products specified only be reference standard : Any product <br /> meeting that standard . <br /> 2 . Product specified by naming several manufacturers : Product of <br /> any named manufacturer meeting specifications . <br /> 3 . Products specified by naming one or more manufacturers and <br /> " or equal " : Submit a request for substitution for any <br /> manufacturer not specifically named . <br /> 1 . 09 SUBSTITUTIONS <br /> A . Only within 30 days after date of Contract will Engineer consider <br /> requests from Contractor for substitutions . Subsequently, substitutions <br /> will be considered only when a product becomes unavailable due to no <br /> fault of the Contractor . <br /> 01600 Material and Equipment Reuse Automation <br /> 01600 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.