My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Document each request with complete data , drawings and samples as <br /> appropriate , substantiating compliance of proposed substitution with <br /> Contract Documents including : <br /> 1 . Comparison of the qualities of the proposed substitution with <br /> the specified . <br /> 2 . Changes required in other elements of the work because of the <br /> substitution . <br /> 3 . Effect on the construction schedule . <br /> 4 . Cost data comparing the proposed substitution with the <br /> product specified . <br /> 5 . Any required license fees or royalties <br /> 6 . Availability of maintenance service , and the source replacement <br /> materials . <br /> C . Request constitutes a representation that Contractor : <br /> 1 . Has investigated proposed product and determined that it <br /> meets or exceeds, in all respects, specified product . <br /> 2 . Will provide the same warranty for substitution as for specified <br /> product . <br /> 3 . Will coordinate installation and make other changes which may <br /> be required for work to be complete in all respects . <br /> 4 . Waives claims for additional costs which may subsequently <br /> become apparent . <br /> D . Substitutions will not be considered when they are indicated or implied <br /> on Shop Drawing or Product Data submittals without separate written <br /> request, or when acceptance will require substantial revision of <br /> Contract Documents , <br /> E . Engineer will review to determine acceptability of proposed <br /> substitution , and will notify Contractor of acceptance or rejection in <br /> writing within a reasonable time . <br /> PART 2 -- PRODUCTS <br /> Not applicable <br /> PART 3 -- EXECUTION <br /> Not applicable <br /> * * END OF SECTION * * <br /> 01600 Material and Equipment Reuse Automation <br /> 01600 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.