not involve a change in the Contract Price or the Contract duration of the activities comprising the Contractor ' s plan
<br /> Times . to accomplish the Work within the Contract Times .
<br /> 21 . General Requirements-- Sections of Division 1 of 33 . Project--The total construction of which the
<br /> the Specifications . The General Requirements pertain to Work to be performed under the Contract Documents may
<br /> all sections of the Specifications . be the whole, or a part .
<br /> 22 . Hazardous Environmental Condition-- The 34 . Project Manual--The bound documentary
<br /> presence at the Site of Asbestos , PCBs, Petroleum , information prepared for bidding and constructing the
<br /> Hazardous Waste, or Radioactive Material in such Work . A listing of the contents of the Project Manual ,
<br /> quantities or circumstances that may present a substantial which may be bound in one or more volumes , is
<br /> danger to persons or property exposed thereto in contained in the table(s ) of contents .
<br /> connection with the Work .
<br /> 35 . Radioactive Material-- Source, special nuclear, or
<br /> 23 . Hazardous Waste--The term Hazardous Waste byproduct material as defined by the Atomic Energy Act
<br /> shall have the meaning provided in Section 1004 of the of 1954 (42 USC Section 2011 et seq .) as amended from
<br /> Solid Waste Disposal Act (42 USC Section 6903 ) as time to time .
<br /> amended from time to time .
<br /> 36 . Related Entity -- An officer, director, partner,
<br /> 24 . Laws and Regulations; Laws or Regulations-- employee, agent, consultant, or subcontractor.
<br /> Any and all applicable laws , rules , regulations , ordinanc-
<br /> es , codes , and orders of any and all governmental bodies , 37 . Resident Project Representative-- The authorized
<br /> agencies , authorities , and courts having jurisdiction . representative of Engineer who may be assigned to the
<br /> Site or any part thereof.
<br /> 25 . Liens--Charges , security interests , or
<br /> encumbrances upon Project funds , real property , or 38 . Samples--Physical examples of materials ,
<br /> personal property . equipment, or workmanship that are representative of
<br /> some portion of the Work and which establish the
<br /> 26 . Allilestone--A principal event specified in the standards by which such portion of the Work
<br /> will be
<br /> Contract Documents relating to an intermediate comple- judged .
<br /> tion date or time prior to Substantial Completion of all the
<br /> Work. 39 . Schedule of Submittals-- A schedule, prepared
<br /> and maintained by Contractor, of required submittals and
<br /> 27 . Notice of Aivard--The written notice by Owner the time requirements to support scheduled performance
<br /> to the Successful Bidder stating that upon timely of related construction activities .
<br /> compliance by the Successful Bidder with the conditions
<br /> precedent listed therein , Owner will sign and deliver the 40 . Schedule of Values--A schedule , prepared and
<br /> Agreement . maintained by Contractor, allocating portions of the
<br /> Contract Price to various portions of the Work and used
<br /> 28 . Notice to Proceed--A written notice given by as the basis for reviewing Contractor ' s Applications
<br /> for
<br /> Owner to Contractor fixing the date on which the Con - Payment.
<br /> tract Times will commence to run and on which
<br /> Contractor shall start to perform the Work under the 41 . Shop Draivings-- All drawings, diagrams
<br />,
<br /> Contract Documents . illustrations, schedules , and other data or information
<br /> which are specifically prepared or assembled by or for
<br /> 29 . Owner- -The individual or entity with whom Contractor and submitted by Contractor to illustrate some
<br /> Contractor has entered into the Agreement and for whom portion of the Work .
<br /> the Work is to be performed .
<br /> 42 . Site-- Lands or areas indicated in the Contract
<br /> 30 . PCBs-- Polychlorinated biphenyls . Documents as being furnished by Owner upon which the
<br /> Work is to be performed , including rights-of- way and
<br /> 31 . Petroleum-- Petroleum , including crude oil or any easements for access thereto , and such other lands
<br /> fraction thereof which is liquid at standard conditions of furnished by Owner which are designated for the use
<br />of
<br /> temperature and pressure (60 degrees Fahrenheit and 14 . 7 Contractor.
<br /> pounds per square inch absolute), such as oil , petroleum ,
<br /> fuel oil , oil sludge , oil refuse , gasoline, kerosene , and oil
<br /> mixed with other non- Hazardous Waste and crude oils .
<br /> 32 . Progress Schedule- -A schedule, prepared and
<br /> maintained by Contractor, describing the sequence and