43 . Specifications--That part of the Contract Engineer ordering an addition , deletion , or revision in the
<br /> Documents consisting of written requirements for Work , or responding to differing or unforeseen subsurface
<br /> materials , equipment, systems , standards and or physical conditions under which the Work is to be
<br /> workmanship as applied to the Work, and certain performed or to emergencies . A Work Change Directive
<br /> administrative requirements and procedural matters will not change the Contract Price or the Contract Times
<br /> applicable thereto . but is evidence that the parties expect that the change
<br /> ordered or documented by a Work Change Directive will
<br /> be incorporated in a subsequently issued Change Order
<br /> 44 . Subcontractor--An individual or entity having a following negotiations by the parties as to its effect,
<br /> if
<br /> direct contract with Contractor or with any other any , on the Contract Price or Contract Times .
<br /> Subcontractor for the performance of a part of the Work
<br /> at the Site . 1 . 02 Terminology
<br /> 45 . Substantial Completion--The time at which the A . The following words or terms are not defined but,
<br /> Work (or a specified part thereof) has progressed to the when used in the Bidding Requirements or Contract
<br /> point where, in the opinion of Engineer, the Work (or a Documents , have the following meaning .
<br /> specified part thereof) is sufficiently complete , in
<br /> accordance with the Contract Documents , so that the B . Intent of Certain Terms or Adjectives
<br /> Work (or a specified part thereof) can be utilized for the
<br /> purposes for which it is intended . The terms " substantially 1 . The Contract Documents include the terms " as
<br /> complete" and " substantially completed" as applied to all allowed ," " as approved ," " as ordered", "as directed"
<br /> or part of the Work refer to Substantial Completion or terms of like effect or import
<br /> to authorize an
<br /> thereof. exercise of professional judgment by Engineer . In
<br /> addition , the adjectives " reasonable," "suitable ,"
<br /> 46 . Successful Bidder- -The Bidder submitting a " acceptable ," " proper," "satisfactory, " or adjectives
<br /> responsive Bid to whom Owner makes an award . of like effect or import are used to describe an action
<br /> or determination of Engineer as to the Work . It is
<br /> 47 . Supplementary Conditions--That part of the intended that such exercise of professional judgment,
<br /> Contract Documents which amends or supplements these action or determination will be solely to evaluate , in
<br /> General Conditions . general , the Work for compliance with the require -
<br /> ments of and information in the Contract Documents
<br /> 48 . Supplier--A manufacturer, fabricator, supplier, and conformance with the design concept of the com -
<br /> distributor, materialman , or vendor having a direct pleted Project as a functioning whole as shown or
<br /> contract with Contractor or with any Subcontractor to indicated in the Contract Documents (unless there is
<br /> furnish materials or equipment to be incorporated in the a specific statement indicating otherwise) . The use of
<br /> Work by Contractor or any Subcontractor. any such term or adjective is not intended to and shall
<br /> not be effective to assign to Engineer any duty or
<br /> 49 . Underground Facilities--All underground authority to supervise or direct the performance of
<br /> pipelines, conduits , ducts , cables , wires , manholes , vaults , the Work or any duty or authority to
<br /> undertake
<br /> tanks, tunnels, or other such facilities or attachments, and responsibility contrary to the provisions of Paragraph
<br /> any encasements containing such facilities, including 9 . 09 or any other provision of the Contract
<br /> those that convey electricity , gases , steam , liquid Documents .
<br /> petroleum products, telephone or other communications ,
<br /> cable television , water, wastewater, storm water, other C . Day
<br /> liquids or chemicals , or traffic or other control systems .
<br /> 1 . The word "day" means a calendar day of 24
<br /> 50 . Unit Price Work-- Work to be paid for on the hours measured from midnight to the next
<br /> basis of unit prices . midnight .
<br /> 51 . GVork--The entire construction or the various D . Defective
<br /> separately identifiable parts thereof required to be
<br /> provided under the Contract Documents . Work includes I . The word " defective ," when modifying the word
<br /> and is the result of performing or providing all labor, " Work," refers to Work that is unsatisfactory
<br />,
<br /> services, and documentation necessary to produce such faulty, or deficient in that it :
<br /> construction , and furnishing, installing, and incorporating
<br /> all materials and equipment into such construction , all as a . does not conform to the Contract Documents ,
<br /> required by the Contract Documents . or
<br /> 52 . Work Change Directive--A written statement to b . does not meet the requirements of any
<br /> Contractor issued on or after the Effective Date of the applicable inspection , reference standard , test, or
<br /> Agreement and signed by Owner and recommended by
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract.