My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
may make a Claim therefor as provided in Paragraph 4 . 03 Differing Subsurface or Physical Conditions <br /> 10 . 05 . <br /> A . Notice : If Contractor believes that any subsurface or <br /> B . Upon reasonable written request, Owner shall furnish physical condition at or contiguous to the Site that is <br /> Contractor with a current statement of record legal title uncovered or revealed either : <br /> and legal description of the lands upon which the Work is <br /> to be performed and Owner ' s interest therein as necessary I . is of such a nature as to establish <br /> that any <br /> for giving notice of or filing a mechanic's or construction "technical data" on which Contractor is entitled to <br /> lien against such lands in accordance with applicable rely as provided in Paragraph 4 . 02 is materially <br /> Laws and Regulations . inaccurate ; or <br /> C . Contractor shall provide for all additional lands and 2 . is of such a nature as to require a change in <br /> the <br /> access thereto that may be required for temporary Contract Documents ; or <br /> construction facilities or storage of materials and equip- <br /> ment. 3 . differs materially from that shown or indicated in <br /> the Contract Documents ; or <br /> 4 . 02 Subsurface and Physical Conditions <br /> 4 . is of an unusual nature , and differs materially <br /> A . Reports and Drmvings: The Supplementary Conditions from conditions ordinarily encountered and generally <br /> identify : recognized as inherent in work of the character <br /> provided for in the Contract Documents ; <br /> 1 . those reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site that then Contractor shall , promptly after becoming aware <br /> Engineer has used in preparing the Contract DOcu- thereof and before further disturbing the subsurface or <br /> meets ; and physical conditions or performing any Work in connec- <br /> tion therewith (except in an emergency as required by <br /> 2 . those drawings of physical conditions in or relat- Paragraph 6 . 16 . A) , notify Owner and Engineer in writing <br /> ing to existing surface or subsurface structures at or about such condition . Contractor shall not further disturb <br /> contiguous to the Site (except Underground such condition or perform any Work in connection <br /> Facilities) that Engineer has used in preparing the therewith (except as aforesaid ) until receipt of <br /> written <br /> Contract Documents . order to do so . <br /> B . Limited Reliance by Contractor on Technical Data B . Engineer 's Review : After receipt of written notice as <br /> Authorized: Contractor may rely upon the general required by Paragraph 4 . 03 . A , Engineer will promptly <br /> accuracy of the "technical data" contained in such reports review the pertinent condition , determine the necessity of <br /> and drawings , but such reports and drawings are not Owner's obtaining additional exploration or tests with <br /> Contract Documents . Such "technical data" is identified respect thereto , and advise Owner in writing (with a copy <br /> in the Supplementary Conditions . Except for such reliance to Contractor) of Engineer ' s findings and conclusions . <br /> on such " technical data," Contractor may not rely upon or <br /> make any claim against Owner or Engineer, or any of C . Possible Price and Times Adjustments <br /> their Related Entities with respect to : <br /> 1 . The Contract Price or the Contract Times , or <br /> 1 . the completeness of such reports and drawings both , will be equitably adjusted to the extent that the <br /> for Contractor ' s purposes , including, but not limited existence of such differing subsurface or physical <br /> to , any aspects of the means , methods , techniques , condition causes an increase or decrease in <br /> sequences , and procedures of construction to be Contractor ' s cost of, or time required for, <br /> perfor- <br /> employed by Contractor, and safety precautions and mance of the Work; subject, however, to the follow- <br /> programs incident thereto; or ing : <br /> 2 . other data, interpretations , opinions , and a. such condition must meet any one or more of <br /> information contained in such reports or shown or the categories described in Paragraph 4 . 03 . A ; <br /> indicated in such drawings ; or and <br /> 3 . any Contractor interpretation of or conclusion b . with respect to Work that is paid for on a Unit <br /> drawn from any "technical data " or any such other Price Basis , any adjustment in Contract Price <br /> data, interpretations, opinions , or information . will be subject to the provisions of Paragraphs <br /> 9 . 07 and 11 . 03 . <br /> 2 . Contractor shall not be entitled to any adjustment <br /> in the Contract Price or Contract Times if: <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.