My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a . Contractor knew of the existence of such d . the safety and protection of all such Under- <br /> conditions at the time Contractor made a final ground Facilities and repairing any damage <br /> commitment to Owner with respect to Contract thereto resulting from the Work . <br /> Price and Contract Times by the submission of a <br /> Bid or becoming bound under a negotiated B . Not Shown or Indicated <br /> contract; or <br /> 1 . If an Underground Facility is uncovered or <br /> b . the existence of such condition could revealed at or contiguous to the Site which was not <br /> reasonably have been discovered or revealed as a shown or indicated , or not shown or indicated with <br /> result of any examination , investigation , explo- reasonable accuracy in the Contract Documents , <br /> ration , test, or study of the Site and contiguous Contractor shall , promptly after becoming aware <br /> areas required by the Bidding Requirements or thereof and before further disturbing conditions <br /> Contract Documents to be conducted by or for affected thereby or performing any Work in <br /> Contractor prior to Contractor's making such connection therewith (except in an emergency <br /> as <br /> final commitment; or required by Paragraph 6 . 16 . A), identify the owner of <br /> such Underground Facility and give written notice to <br /> c . Contractor failed to give the written notice as that owner and to Owner and Engineer. Engineer will <br /> required by Paragraph 4 . 03 . A . promptly review the Underground Facility and <br /> determine the extent, if any , to which a change is <br /> 3 . If Owner and Contractor are unable to agree on required in the Contract Documents to reflect and <br /> entitlement to or on the amount or extent, if any , of document the consequences of the existence or <br /> any adjustment in the Contract Price or Contract location of the Underground Facility . During <br />such <br /> Times , or both , a Claim may be made therefor as time, Contractor shall be responsible for the <br /> safety <br /> provided in Paragraph 10 . 05 . However, Owner and and protection of such Underground Facility . <br /> Engineer, and any of their Related Entities shall not <br /> be liable to Contractor for any claims , costs , losses , 2 . If Engineer concludes that a change in <br /> the <br /> or damages ( including but not limited to all fees and Contract Documents is required , a Work Change <br /> charges of engineers , architects , attorneys , and other Directive or a Change Order will be issued to reflect <br /> professionals and all court or arbitration or other and document such consequences . An equitable <br /> dispute resolution costs) sustained by Contractor on adjustment shall be made in the Contract Price or <br /> or in connection with any other project or anticipated Contract Times , or both , to the extent that they are <br /> project . attributable to the existence or location of any <br /> Underground Facility that was not shown or indicated <br /> 4 . 04 Underground Facilities or not shown or indicated with reasonable accuracy <br /> in the Contract Documents and that Contractor did <br /> A . Shown or Indicated: The information and data shown not know of and could not reasonably have been <br /> or indicated in the Contract Documents with respect to expected to be aware of or to have anticipated . <br /> If <br /> existing Underground Facilities at or contiguous to the Owner and Contractor are unable to agree on <br /> Site is based on information and data furnished to Owner entitlement to or on the amount or extent, if any , of <br /> or Engineer by the owners of such Underground Facili - any such adjustment in Contract Price or Contract <br /> ties , including Owner, or by others . Unless it is otherwise Times, Owner or Contractor may make a Claim <br /> expressly provided in the Supplementary Conditions : therefor as provided in Paragraph 10 . 05 . <br /> 1 . Owner and Engineer shall not be responsible for 4 . 05 Reference Points <br /> the accuracy or completeness of any such information <br /> or data; and A . Owner shall provide engineering surveys to establish <br /> reference points for construction which in Engineer ' s <br /> 2 . the cost of all of the following will be included judgment are necessary to enable Contractor to proceed <br /> in the Contract Price, and Contractor shall have full with the Work . Contractor shall be responsible for laying <br /> responsibility for: out the Work, shall protect and preserve the established <br /> reference points and property monuments , and shall make <br /> a . reviewing and checking all such information no changes or relocations without the prior written <br /> and data, approval of Owner. Contractor shall report to Engineer <br /> whenever any reference point or property monument is <br /> b . locating all Underground Facilities shown or lost or destroyed or requires relocation because of <br /> indicated in the Contract Documents , necessary changes in grades or locations, and shall be <br /> responsible for the accurate replacement or relocation of <br /> c . coordination of the Work with the owners of such reference points or property monuments by <br /> such Underground Facilities , including Owner, professionally qualified personnel . <br /> during construction , and <br /> EJCDC C-700 Standard Genera Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.