Laserfiche WebLink
4 . 06 Hazardous Environmental Condition at Site (i) specifying that such condition and any affected area is <br /> or has been rendered safe for the resumption of Work ; or <br /> A . Reports and Drawings: Reference is made to the ( ii ) specifying any special conditions under which such <br /> Supplementary Conditions for the identification of those Work may be resumed safely . If Owner and Contractor <br /> reports and drawings relating to a Hazardous cannot agree as to entitlement to or on the amount or <br /> Environmental Condition identified at the Site , if any , that extent, if any, of any adjustment in Contract Price or <br /> have been utilized by the Engineer in the preparation of Contract Times , or both , as a result of such Work stop- <br /> the Contract Documents . page or such special conditions under which Work is <br /> agreed to be resumed by Contractor, either party may <br /> B . Limited Reliance by Contractor on Technical Data make a Claim therefor as provided in Paragraph 10 . 05 . <br /> Authorized: Contractor may rely upon the general <br /> accuracy of the "technical data" contained in such reports F . If after receipt of such written notice Contractor does <br /> and drawings , but such reports and drawings are not not agree to resume such Work based on a reasonable <br /> Contract Documents . Such "technical data" is identified belief it is unsafe, or does not agree to resume such Work <br /> in the Supplementary Conditions . Except for such reliance under such special conditions , then Owner may order the <br /> on such "technical data, " Contractor may not rely upon or portion of the Work that is in the area affected by such <br /> make any claim against Owner or Engineer, or any of condition to be deleted from the Work . If Owner and <br /> their Related Entities with respect to : Contractor cannot agree as to entitlement to or on the <br /> amount or extent, if any , of an adjustment in Contract <br /> 1 . the completeness of such reports and drawings Price or Contract Times as a result of deleting such <br /> for Contractor ' s purposes , including, but not limited portion of the Work, then either party may make a Claim <br /> to, any aspects of the means , methods, techniques , therefor as provided in Paragraph 10 . 05 . Owner may have <br /> sequences and procedures of construction to be such deleted portion of the Work performed by Owner ' s <br /> employed by Contractor and safety precautions and own forces or others in accordance with Article 7 . <br /> programs incident thereto ; or <br /> G . To the fullest extent permitted by Laws and <br /> 2 . other data, interpretations , opinions and Regulations , Owner shall indemnify and hold harmless <br /> information contained in such reports or shown or Contractor, Subcontractors , and Engineer, and the <br /> indicated in such drawings ; or officers, directors , partners , employees , agents , <br /> consultants , and subcontractors of each and any of them <br /> 3 . any Contractor interpretation of or conclusion from and against all claims , costs , losses , and damages <br /> drawn from any "technical data" or any such other ( including but not limited to all fees and charges of <br /> data, interpretations, opinions or information . engineers, architects, attorneys , and other professionals <br /> and all court or arbitration or other dispute resolution <br /> C . Contractor shall not be responsible for any Hazardous costs) arising out of or relating to a Hazardous <br /> Environmental Condition uncovered or revealed at the Environmental Condition , provided that such Hazardous <br /> Site which was not shown or indicated in Drawings or Environmental Condition : ( i) was not shown or indicated <br /> Specifications or identified in the Contract Documents to in the Drawings or Specifications or identified in the <br /> be within the scope of the Work . Contractor shall be Contract Documents to be included within the scope of <br /> responsible for a Hazardous Environmental Condition the Work, and ( ii ) was not created by Contractor or by <br /> created with any materials brought to the Site by anyone for whom Contractor is responsible . Nothing in <br /> Contractor, Subcontractors, Suppliers , or anyone else for this Paragraph 4 . 06G shall obligate Owner to indemnify <br /> whom Contractor is responsible . any individual or entity from and against the conse- <br /> quences of that individual ' s or entity ' s own negligence . <br /> D . If Contractor encounters a Hazardous Environmental <br /> Condition or if Contractor or anyone for whom Contractor H . To the fullest extent permitted by Laws and <br /> is responsible creates a Hazardous Environmental Regulations, Contractor shall indemnify and hold <br /> Condition , Contractor shall immediately : ( i ) secure or harmless Owner and Engineer, and the officers , directors , <br /> otherwise isolate such condition ; ( ii ) stop all Work in partners , employees , agents , consultants , and <br /> connection with such condition and in any area affected subcontractors of each and any of them from and against <br /> thereby (except in an emergency as required by Paragraph all claims , costs , losses , and damages (including but not <br /> 6 . 16 . A ); and ( iii ) notify Owner and Engineer (and limited to all fees and charges of engineers, architects, <br /> promptly thereafter confirm such notice in writing) . attorneys , and other professionals and all court or <br /> Owner shall promptly consult with Engineer concerning arbitration or other dispute resolution costs) arising out of <br /> the necessity for Owner to retain a qualified expert to or relating to a Hazardous Environmental Condition <br /> evaluate such condition or take corrective action , if any . created by Contractor or by anyone for whom Contractor <br /> is responsible . Nothing in this Paragraph 4 . 06 . H shall <br /> E . Contractor shall not be required to resume Work in obligate Contractor to indemnify any individual or entity <br /> connection with such condition or in any affected area from and against the consequences of that individual ' s or <br /> until after Owner has obtained any required permits entity ' s own negligence . <br /> related thereto and delivered to Contractor written notice : <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 14 <br />