My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01200 <br /> PROJECT MEETINGS <br /> PART 1 — GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A . The Contractor shall cooperate and coordinate with the Resident Project Representative to <br /> schedule and administer pre-construction meeting, periodic progress meetings and <br /> specially called meetings throughout progress of the work . <br /> 1 . Prepare agenda for meetings . <br /> 2 . Make physical arrangements for meetings . <br /> 3 . Preside at meetings . <br /> 4 . Record the minutes ; include significant proceedings and decisions . <br /> 5 . Reproduce and distribute copies of minutes within 15 working days after each <br /> meeting. <br /> a. To participants in the meeting. <br /> b . To Owner, Engineer, and other parties affected by decisions made at the <br /> meeting . <br /> B . Representatives of Contractors , Owner, Subcontractors and suppliers attending meetings <br /> shall be qualified and authorized to act on behalf of the entity each represents . <br /> C . Attend meetings to ascertain that work is expedited consistent with Contract Documents <br /> and construction schedules . <br /> 1 . 02 RELATED REQUIREMENTS <br /> A . instructions to Bidders are included in Division 0 . <br /> B . Construction Schedules are included in Section 01311 . <br /> C . Contract Closeout is included in Section 01700 . <br /> 1 . 03 PRE-CONSTRUCTION MEETING <br /> A . Schedule a preconstruction meeting no later than 15 days after date of Notice to Proceed . <br /> B . Location : A central site , convenient for all parties , designated by the Owner . <br /> C . Attendance <br /> 1 . Owner' s Representative . <br /> 2 . Engineer and his/her professional consultants . <br /> 3 . Resident Project Representative . <br /> 4 . Contractor' s Superintendent. <br /> 5 . Major Subcontractors . <br /> 6 . Major suppliers . <br /> 01200 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.