My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-210
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 1:54:24 PM
Creation date
10/1/2015 5:41:01 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
screen (FlexRake), to be constructed under Task 313 <br /> 6 . An automatic FlexRake, typically as manufactured by Duperon Corporation of Saginaw Michigan. The FlexRake <br /> facilitates capture and removal of harvested algae filaments, as well as continuous removal of sloughed algae and <br /> incidental solids5 , to be constructed under Task 313 <br /> 7 . Stormwater/Brine Pipeline, a large diameter force main from the South Relief Canal Pump Station to the PC South <br /> Algal Nutrient Removal Facility Site, to be constructed under Task 3C . This pipeline will carry canal water to the <br /> ARNF . Another pipeline will carry brine from the South County RO Water Treatment Plant to the ARNF where it <br /> will mix with the canal water before flowing onto the ARNF . <br /> TASK NUMBER 3A <br /> TASK NAME : BMP Construction — South Relief Canal Pump Station <br /> TASK DESCRIPTION : 319 grant funding will be utilized in part for construction of the South Relief Canal Pump Station . <br /> ALLOWABLE COSTS : The estimated contractual construction costs for the pump station and related components <br /> is <br /> $ 1 , 126 , 000 , of which $563 , 000 maximum will be expended from 319 grant funds and $ 563 ,000 minimum is required <br /> match <br /> expenditure for the 319 grant funds . <br /> DELIVERABLES : 1 ) Dated color photographs of the site prior to and during construction and immediately following <br /> completion of the project; 2) complete installation of the entire pump station ; 3 ) As-built certification for the pump station <br />; 4) <br /> electronic files of the as-built drawings completed by a professional land surveyor; and 5 ) signed statement from Grantee <br />' s <br /> project certified engineer indicating construction has been completed in accordance with approved design . <br /> PERFORMANCE STANDARD : The Department Grant Manager will review the photographs and certification of <br /> completion for all components by the Grantee ' s project certified engineer to verify that construction has been completed <br /> for <br /> all components in accordance with the approved plans . <br /> TASK NUMBER 3B <br /> TASK NAME : BMP Construction — PC South Algal Nutrient Removal Facility <br /> TASK DESCRIPTION : TMDL grant funding will be utilized in part for construction of the PC South <br /> Algal Nutrient <br /> Removal Facility and its associated appurtenances and hardware . <br /> ALLOWABLE COSTS : The estimated contractual construction costs for the Algal Nutrient Removal Facility and related <br /> components is $ 5 ,426, 847 , of which $ 1 , 376,900 maximum will be expended from TMDL grant funds <br /> and $4,049,947 <br /> minimum is required match expenditure for the TMDL grant funds . <br /> DELIVERABLES : 1 ) Dated color photographs of the site prior to and during construction and immediately following <br /> completion of the project ; 2) complete installation of the entire Algal Nutrient Removal Facility system <br /> per the project <br /> description; 3 ) As-built certification for the stormwater management system ; 4 ) electronic files of the <br /> as-built drawings <br /> completed by a professional land surveyor; and 5 ) signed statement from Grantee ' s project certified engineer <br /> indicating <br /> construction has been completed in accordance with approved design . <br /> PERFORMANCE STANDARD : The Department Grant Manager will review the photographs and certification <br />of <br /> completion for all components by the Grantee ' s project certified engineer to verify that construction has been completed <br /> for <br /> all components in accordance with the approved plans . <br /> TASK NUMBER 3C <br /> TASK NAME : BMP Construction — Stormwater/Brine Pipeline <br /> TASK DESCRIPTION : TMDL grant funding will be utilized in part for construction of the Stormwater/Brine Pipeline and <br /> their associated appurtenances and hardware . <br /> ALLOWABLE COSTS : The estimated contractual construction costs for these components is $ 1 , 164 , 853 .40, of <br /> which <br /> $287 ,000 maximum will be expended from 319 grant funds and $ 877 , 853 .40 minimum is required match expenditure for the <br /> 319 grant funds . <br /> DELIVERABLES : 1 ) Dated color photographs of the site prior to and during construction and immediately following <br /> completion of the project; 2) complete installation of the entire Algal Nutrient Removal Facility system <br /> per the project <br /> description; 3 ) As-built certification for the stormwater management system ; 4 ) electronic files of the <br /> as-built drawings <br /> completed by a professional land surveyor; and 5 ) signed statement from Grantee ' s project certified engineer <br /> indicating <br /> construction has been completed in accordance with approved design . <br /> 5 In some cases in which high levels of suspended solids reduction is required, additional processes such as wedge wire <br /> screens, hydroscreens, or sand filters may be included to further polish the effluent after coarse screening through the Flex <br /> Rake . <br /> DEP Agreement No . G0353 , Attachment A- 1 , Page 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.