Laserfiche WebLink
PERFORMANCE STANDARD : The Department Grant Manager will review the photographs and certification of <br /> completion for all components by the Grantee ' s project certified engineer to verify that construction has been completed <br /> for <br /> all components in accordance with the approved plans . <br /> TASK NUMBER : 4 <br /> TASK NAME : Public Education <br /> TASK DESCRIPTION : This task includes public presentations and construction of a nature trail with informational signs <br /> explaining the environmental benefits of the ATS system and methods for reducing nutrient loading into the receiving waters <br /> of the state . There is a video currently available for viewing at the dedicated stormwater educational website <br /> (www . irestormwater. com) that describes nutrient removal projects the county has implemented to date, as <br /> well as an <br /> introduction to the PC South project. Walking trails and signage will be constructed, civic forums will <br /> be ongoing . An <br /> updated water quality improvement informational video will be produced to include the ATS Facility, to be broadcast on the <br /> IRC county public television station and couty ' s stormwater educational website . <br /> ALLOWABLE COSTS : Estimated cost of $54,000 . 00 for walking trail , signs and informational/educational video . All <br /> costs in this task are additional expenditures to be made by the Grantee, not required match . <br /> DELIVERABLES : Text and final draft video in electronic format for the website will be submitted to <br /> the DEP Grant <br /> Manager for prior approval before airing and distribution. Submission of CD ' s with the final Public Services <br /> Announcements released to the public with information on when they were aired. Link to the Indian River County website <br /> with information on updates made for the project. Dated photographs of the installed walking trails and signage, dates/sign4n <br /> sheets for when the civic forums are held. <br /> PERFORMANCE STANDARD : The DEP Grant Manager will review the draft and final deliverables to verify compliance <br /> with the Agreement ' s terms and conditions, the TMDL grant requirements and the Department ' s policies <br /> on public <br /> education, and will review evidence of the number of contacts made with the public through each component of the outreach <br /> task . <br /> TASK NUMBER: 5 <br /> TASK NAME : Monitoring <br /> TASK DESCRIPTION : The Grantee must complete and submit to the Department a Quality Assurance Project <br /> Plan <br /> (QAPP) for monitoring prior to commencement of any monitoring. The monitoring plan will specify the sampling locations, <br /> sampling instruments, and parameters to be sampled. The parameters shall include, but are not limited to : TN ( lbs/yr), <br /> TP <br /> (lbs/yr), TSS ( lbs/yr), Cd, Cr, Cu, Zn, NO2/NO3 , TKN , NH3 , Orthophosphate, Fecal coliform, rainfall and flow. Because <br /> the flow through the system is continuous, discrete sampling during rainfall events is meaningless . <br /> The flow will be <br /> monitored on a timed composite sampling basis during the one-year monitoring period. Monitoring is to be performed <br /> at <br /> inflow and outflow locations of each BMPs installed and in accordance with the approved QAPP . Sampling locations shall <br /> be recorded and verified using a GPS device . Project-specific details must be added during QAPP development . Harvested <br /> material shall be weighed wet with each harvest, either directly or by determining wet density and <br /> volume . Three (3 ) <br /> composite samples shall be analyzed for percent moisture , and these composited on a monthly basis <br /> for analysis for <br /> phosphorus, nitrogen, carbon, and ash . <br /> ALLOWABLE COSTS : The estimated contractual costs for the collection and lab analysis of monitoring events results is <br /> $200,000 . All costs in this task are additional expenditures to be made by the Grantee, not required match. <br /> DELIVERABLES : Department approved QAPP and submission of monitoring results . Discussion of analysis <br /> of <br /> monitoring results and the pollutant load reductions from each applicable BMP either as a stand-alone <br /> Final Efficiency <br /> Evaluation Monitoring Report or as part of the Final Project Report . <br /> PERFORMANCE STANDARD : The Department Grant Manager will review the QAPP for compliance with this <br /> Agreement and DEP Standard Operating Procedures for monitoring ; submission of approved QAPP ; and submission <br /> of <br /> monitoring results . Review of Final Efficiency Evaluation Monitoring Report (or equivalent description in the Final Project <br /> Report) to verify that monitoring was completed in accordance with the approved QAPP and the results were analyzed <br /> and <br /> discussed regarding removal efficiency . <br /> TASK NUMBER: 6 <br /> TASK NAME : Draft and Final Report <br /> TASK DESCRIPTION : The Grantee must complete and submit to the Department a Final Report . The Final Report is <br /> intended to capture the outcome and results of the selected project, including all tasks included in this <br /> project. It shall <br /> include, at least, the following : a summary of monitoring results and an explanation of any unexpected monitoring results or <br /> unexpected occurrences . This shall include, where applicable, why a BMP did not obtain or exceeded the expected removal <br /> efficiency ; any problems encountered and how those problems were overcome ; an explanation of any project delays ; a brief <br /> DEP Agreement No . G0353 , Attachment A- 1 , Page 7 of 14 <br />