My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-212
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 9:51:53 AM
Creation date
10/1/2015 2:25:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/07/2010
Control Number
2010-212
Agenda Item Number
12.J.2
Entity Name
Derrico Construction Coroporation
Subject
Reclaimed Water Line Replacements
Requirements Labor Contract
Project Number
UCP#4054
Bid Number
2010052
Supplemental fields
SmeadsoftID
9776
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00530j V 10 <br /> RECEIVED <br /> FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR 1 . 2 <br /> CONSTRUCTION OF WATER , SEWER AND RECLAIMED WATER LINUG 0 6 2010 <br /> REPLACEMENTS/ EXTENSIONS AND MISCELLANEOUS <br /> ANNUAL REQUIREMENTS LABOR CONTRACT UTILITIES a ! a <br /> INDIAN RIVER COUNTY BID N0 , 2010052 <br /> UTILITIES PROJECT NO , UCP#4054 <br /> THIS AGREEMENT dated the 7th day of September in the year 2010 <br /> by and between Indian River County , a political subdivision of the State of Florida ( hereinafter <br /> called OWNER ) and Derrico Construction Corporation ( hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR , in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows : <br /> ARTICLE 1 , WORK <br /> 1 . 1 CONTRACTOR shall complete all work as specified or indicated in the Contract Documents . <br /> The work is generally described as follows : <br /> General Project Description : The proposed work consists of various water distribution , <br /> wastewater collection and reclaimed water transmission system improvements at various <br /> locations within the Urban Service Boundary in Indian River County and as specified in each of <br /> the Owner' s individual Work Authorizations/Work Orders issued throughout the life of the <br /> Contract . The work may include after hours work and emergency type as defined in contract <br /> documents . All material (furnished by County ) and all equipment furnished and all work <br /> performed ( by Contractor) shall be in strict accordance with the Indian River County <br /> Department of Utility Services Water & Wastewater Utility Standards dated February 2008 , or <br /> latest edition , which may be obtained at no cost online from the Indian River County Utilities <br /> Department web site . The work is generally located in Indian River County in the Urban Service <br /> Area , although transmission utilities are located outside of this boundary . <br /> 1 . 2 . CONTRACTOR acknowledges and agrees that : ( a ) this Agreement is an "Annual <br /> Requirements Labor Contract" ; ( b ) no representation or guarantee is made by Indian River <br /> County as OWNER as to the minimum or maximum dollar value , volume of work , or type of <br /> work that CONTRACTOR will receive during the term of this Agreement ; and ( c ) OWNER will <br /> issue Work Authorizations/Work Orders to CONTRACTOR during the term of this Agreement <br /> based on the prices set forth in the Bid Proposal ( Schedule of Bid Items ) attached to <br /> the <br /> CONTRACTOR ' s Bid Form . <br /> ARTICLE 2 . ENGINEER <br /> The project has been designed by Gordon E . Sparks , P . E . , Indian River County Utilities <br /> Department , hereinafter called ENGINEER , and who is to act as OWNER' S representative , <br /> assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in <br /> the Contract Documents in connection with completion of the work in accordance with the <br /> Contract Documents . <br /> ARTICLE 3 , CONTRACT TIME . <br /> 3 . 1 Contractor agrees that the work will be completed in accordance with the time frame for <br /> substantial completion and final completion as specified in each individual Work <br /> Authorizations /Work Orders to be issued for each project by the Engineer based on the <br /> Schedule of Bid Items and as approved by the Board of County Commissioners . <br /> Al - 00530 Agreement Between County and Derrico ( EJCDC) <br /> 00530- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.