My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-089A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-089A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2016 1:36:26 PM
Creation date
10/1/2015 1:59:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/12/2011
Control Number
2011-089A
Agenda Item Number
8.J.
Entity Name
Dickerson Florida
Subject
Contract and Specifications
Oslo Road Phase II Roadway Widening
Area
43rd Ave. to 27th Ave.
Project Number
0533
Bid Number
2011018
Supplemental fields
SmeadsoftID
9567
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comments — Bryan Rheault with Bridge Design Associates , Inc. <br /> 9 An existing pedestrian-pole and box on ,the NW side of the 43rd Street Bridge will be re- <br /> located by the County. <br /> Comments Michael Hotchkiss with Utilities service <br /> o Any service under pavement shall be placed in larger sized conduit sleeve. Any <br /> service extensions shall be constructed by replacing the entire polyethylene <br /> service from the water main to the new meter location . ( No splicing permitted) . The <br /> cost shall be included in Line Item 1645-800 WATER METER ( RELOCATE) <br /> o Prior to construction , all valves shall be located by GPS and properly mapped out. <br /> The cost shall be included in Line Item 108- 1 AS-BUILTS <br /> o All valves shall be maintained and accessible during construction . <br /> o As-builts of the utilities shall be completed and approved prior to any testing <br /> (pressure , bacteriological , etc. ) . The cost shall be included in Line Item Line Item <br /> 108- 1 AS-BUILTS <br /> o Pressure and/or bacteriological testing shall be included in all utility stub outs. <br /> o The cost for the sampling points on the utility lines shall be included in the cost of <br /> the pipe . Also included in this cost and is the responsibility of the contractor is the <br /> jumper for filling , pressure test, chlorination , filling , flushing , bacteriological testing , <br /> etc. <br /> Y Utility services included in contract <br /> ® Locate all water Valves to the As-Builts <br /> a As- builts and pressure tests are required before Bacterial Testing <br /> Discussions <br /> ® MOT is it certified by engineer? Will be addressed in Addendum # 1 <br /> Trees must be guaranteed for 120 days , Contractor must take due care for survival . <br /> Meeting was adjourned <br /> Attachment : Sign in sheet. <br /> F:Tublic Wor6'NE;NGINEEFJNG DIVISION PROJECTS\(1333 -Oslo Rd Phase TI (43rd Are to 2:th A%je )% Admin(.>4EETEgGSl.Pre-bid meeting <br /> minutes 2-9- 1 / .doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.