My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:03:03 PM
Creation date
10/1/2015 5:01:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227C
Agenda Item Number
12.I.2
Entity Name
Dickerson Florida Inc.
Subject
Contract Documents and Specifications
66th Avenue Roadway Improvements
Area
SR 60 to North of 49th Street
Project Number
0545 & 0370
Bid Number
2013008
Supplemental fields
SmeadsoftID
11696
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. Drawings—That part of the Contract 28 . Notice of Awarrl—The written notice by <br /> Documents prepared or approved by ENGINEER OWNER to the apparent successful bidder stating that <br /> which graphically shows the scope, extent, and upon timely compliance by the apparent successful <br /> character of the Work to be performed by bidder with the conditions precedent listed therein , <br /> CONTRACTOR . Shop Drawings and other OWNER will sign and deliver the Agreement. <br /> CONTRACTOR submittals are not Drawings as so <br /> defined . 29 . Notice to Proceed—A written notice given <br /> by OWNER to CONTRACTOR fixing the date on <br /> 18. Effective Date of the Agreement The which the Contract Times will commence to run and <br /> date indicated in the Agreement on which it becomes on which CONTRACTOR shall start to perform the <br /> effective, but if no such date is indicated , it means the Work under the Contract Documents. <br /> date on which the Agreement is signed and delivered <br /> by the last of the two parties to sign and deliver. 30. OWNER—The individual , entity, public <br /> body, or authority with whom CONTRACTOR has <br /> 19. ENGINEER—The individual or entity entered into the Agreement and for whom the Work is <br /> named as such in the Agreement. to be performed . <br /> 20. ENGINEER's Consultant—An individual or 31 . Partial Utilization—Use by OWNER of a <br /> entity having a contract with ENGINEER to furnish substantially completed part of the Work for the pur- <br /> services as ENGINEER's independent professional pose for which it is intended (or a related purpose) <br /> associate or consultant with respect to the Project and prior to Substantial Completion of all the Work. <br /> who is identified as such in the Supplementary <br /> Conditions. 32. PCBs—Polychlorinated biphenyls. <br /> 21 . Field Order—A written order issued by 33. Petroleum—Petroleum , including crude oil <br /> ENGINEER which requires minor changes in the or any fraction thereof which is liquid at standard <br /> Work but which does not involve a change in the conditions of temperature and pressure (60 <br />degrees <br /> Contract Price or the Contract Times. Fahrenheit and 14 . 7 pounds per square inch <br /> absolute), such as oil , petroleum , fuel oil, oil sludge, oil <br /> 22 . General Requirements—Sections of refuse, gasoline, kerosene, and oil mixed with other <br /> Division 1 of the Specifications. The General non-Hazardous Waste and crude oils. <br /> Requirements pertain to all sections of the Specifica- <br /> tions. 34. Project—The total construction of which <br /> the Work to be performed under the Contract <br /> 23. Hazardous Environmental Condition—The Documents may be the whole, or a part as may be <br /> presence at the Site of Asbestos, PCBs, Petroleum , indicated elsewhere in the Contract Documents. <br /> Hazardous Waste, or Radioactive Material in such <br /> quantities or circumstances that may present a 35. Project Manual—The bound documentary <br /> substantial danger to persons or property exposed information prepared for bidding and constructing the <br /> thereto in connection with the Work. Work. A listing of the contents of the Project Manual, <br /> which may be bound in one or more volumes, is <br /> 24. Hazardous Waste—The term Hazardous contained in the table(s) of contents. <br /> Waste shall have the meaning provided in Section <br /> 1004 of the Solid Waste Disposal Act (42 USC 36, Radioactive Mateda/- Source, special <br /> Section 6903) as amended from time to time. nuclear, or byproduct material as defined by the <br /> Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> 25. Laws and Regulations; Laws or Regulat- seq. ) as amended from time to time. <br /> ions—Any and all applicable laws , rules, regulations, <br /> ordinances, codes, and orders of any and all govern- 37. Resident Project Representative—The <br /> mental bodies, agencies, authorities, and courts authorized representative of ENGINEER who may be <br /> having jurisdiction . assigned to the Site or any part thereof. <br /> 26. Liens—Charges, security interests, or 38. Sarnples- Physical examples of <br /> encumbrances upon Project funds, real property, or materials, equipment, or workmanship that are <br /> personal property. representative of some portion of the Work and which <br /> establish the standards by which such portion of the <br /> 27. Milestone—A principal event specified in Work will be judged . <br /> the Contract Documents relating to an intermediate <br /> completion date or time prior to Substantial Comple- 39. Shop Drawings—All drawings, diagrams, <br /> tion of all the Work. illustrations, schedules, and other data or information <br /> 00700 - General Conditions REV 0407.doc <br /> 00700 - 6 <br /> F:%Public WorksIENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)Vldmim\Bid Documents\00700 - General Conditions REV 04 ,07.doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.