Laserfiche WebLink
which are specifically prepared or assembled by or for Work includes and is the result of performing or <br /> CONTRACTOR and submitted by CONTRACTOR to providing all labor, services, and documentation <br /> illustrate some portion of the Work. necessary to produce such construction , and <br /> furnishing , installing , and incorporating all materials <br /> 40. Site—Lands or areas indicated in the and equipment into such construction , all as required <br /> Contract Documents as being furnished by OWNER by the Contract Documents. <br /> upon which the Work is to be performed , including <br /> rights-of-way and easements for access thereto, and 49 . Work Change Directive—A written <br /> such other lands furnished by OWNER which are statement to CONTRACTOR issued on or after the <br /> designated for the use of CONTRACTOR . Effective Date of the Agreement and signed by <br /> OWNER and recommended by ENGINEER ordering <br /> 41 . Specfcations�That part of the Contract an addition , deletion , or revision in the Work, or <br /> Documents consisting of written technical descriptions responding to differing or unforeseen subsurface or <br /> of materials, equipment, systems, standards, and physical conditions under which the Work is to be <br /> workmanship as applied to the Work and certain performed or to emergencies. A Work Change <br /> administrative details applicable thereto. Directive will not change the Contract Price or the <br /> Contract Times but is evidence that the parties expect <br /> 42 . Subcontractor—An individual or entity that the change ordered or documented by a Work <br /> having a direct contract with CONTRACTOR or with Change Directive will be incorporated in a subse- <br /> any other Subcontractor for the performance of a part quently issued Change Order following negotiations by <br /> of the Work at the Site. the parties as to its effect, if any, on the Contract . Price <br /> or Contract ct Time_ s. <br /> 43. Substantial Completion—The time at <br /> which the Work (or a specified part thereof) has 50. Written Amendment—A written statement <br /> progressed to the point where, in the opinion of modifying the Contract Documents, signed by <br /> ENGINEER, the Work (or a specified part thereof) is OWNER and CONTRACTOR on or after the Effective <br /> sufficiently complete, in accordance with the Contract Date of the Agreement and normally dealing with the <br /> Documents, so that the Work (or a specified part non-engineering or nontechnical rather than <br />strictly <br /> thereof) can be utilized for the purposes for which it is construction-related aspects of the Contract Docu- <br /> intended. The terms "substantially complete" and ments. <br /> "substantially completed" as applied to all or part of the <br /> Work refer to Substantial Completion thereof. 1 . 02 Terminology <br /> 44. Supplementary Conditions—That part of A. Intent of Certain Terms or Adjectives <br /> the Contract Documents which amends or <br /> supplements these General Conditions. 1 . Whenever in the Contract Documents the <br /> terms "as allowed , " "as approved , " or terms of like <br /> 45. Supplier—A manufacturer, fabricator, effect or import are used , or the adjectives <br /> supplier, distributor, materialman , or vendor having a "reasonable, " "suitable, " "acceptable," "proper, " <br /> direct contract with CONTRACTOR or with any "satisfactory," or adjectives of like effect or import <br /> Subcontractor to furnish materials or equipment to be are used to describe an action or determination of <br /> incorporated in the Work by CONTRACTOR or any ENGINEER as to the Work, it is intended that such <br /> Subcontractor. action or determination will be solely to evaluate, in <br /> general, the completed Work for compliance with <br /> 46. Underground Facilities—All underground the requirements of and information in the Contract <br /> pipelines, conduits, ducts, cables, wires, manholes, Documents and conformance with the design <br /> vaults, tanks, tunnels, or other such facilities or concept of the completed Project as a functioning <br /> attachments, and any encasements containing such whole as shown or indicated in the Contract <br /> facilities, including those that convey electricity, gases, Documents (unless there is a specific statement <br /> steam, liquid petroleum products, telephone or other indicating otherwise). The use of any such term or <br /> communications, cable television , water, wastewater, adjective shall not be effective to assign to ENGk <br /> storm water, other liquids or chemicals, or traffic or NEER any duty or authority to supervise or <br /> direct <br /> other control systems. the performance of the Work or any duty or <br /> authority to undertake responsibility contrary to the <br /> 47. Unit Price Work—Work to be paid for on provisions of paragraph 9. 10 or any other provision <br /> the basis of unit prices. of the Contract Documents. <br /> 48. Work—The entire completed construction <br /> or the various separately identifiable parts thereof re- <br /> quired to be provided under the Contract Documents. <br /> 00700 - General Conditions REV 04.07.doc <br /> 00700 - 7 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0545.66Th Ave SR60 to 57th St (Arcadis)V\dmiml8id Documents\00700 - General Conditions REV 04-07.doc <br />