which are specifically prepared or assembled by or for Work includes and is the result of performing or
<br /> CONTRACTOR and submitted by CONTRACTOR to providing all labor, services, and documentation
<br /> illustrate some portion of the Work. necessary to produce such construction , and
<br /> furnishing , installing , and incorporating all materials
<br /> 40. Site—Lands or areas indicated in the and equipment into such construction , all as required
<br /> Contract Documents as being furnished by OWNER by the Contract Documents.
<br /> upon which the Work is to be performed , including
<br /> rights-of-way and easements for access thereto, and 49 . Work Change Directive—A written
<br /> such other lands furnished by OWNER which are statement to CONTRACTOR issued on or after the
<br /> designated for the use of CONTRACTOR . Effective Date of the Agreement and signed by
<br /> OWNER and recommended by ENGINEER ordering
<br /> 41 . Specfcations�That part of the Contract an addition , deletion , or revision in the Work, or
<br /> Documents consisting of written technical descriptions responding to differing or unforeseen subsurface or
<br /> of materials, equipment, systems, standards, and physical conditions under which the Work is to be
<br /> workmanship as applied to the Work and certain performed or to emergencies. A Work Change
<br /> administrative details applicable thereto. Directive will not change the Contract Price or the
<br /> Contract Times but is evidence that the parties expect
<br /> 42 . Subcontractor—An individual or entity that the change ordered or documented by a Work
<br /> having a direct contract with CONTRACTOR or with Change Directive will be incorporated in a subse-
<br /> any other Subcontractor for the performance of a part quently issued Change Order following negotiations by
<br /> of the Work at the Site. the parties as to its effect, if any, on the Contract . Price
<br /> or Contract ct Time_ s.
<br /> 43. Substantial Completion—The time at
<br /> which the Work (or a specified part thereof) has 50. Written Amendment—A written statement
<br /> progressed to the point where, in the opinion of modifying the Contract Documents, signed by
<br /> ENGINEER, the Work (or a specified part thereof) is OWNER and CONTRACTOR on or after the Effective
<br /> sufficiently complete, in accordance with the Contract Date of the Agreement and normally dealing with the
<br /> Documents, so that the Work (or a specified part non-engineering or nontechnical rather than
<br />strictly
<br /> thereof) can be utilized for the purposes for which it is construction-related aspects of the Contract Docu-
<br /> intended. The terms "substantially complete" and ments.
<br /> "substantially completed" as applied to all or part of the
<br /> Work refer to Substantial Completion thereof. 1 . 02 Terminology
<br /> 44. Supplementary Conditions—That part of A. Intent of Certain Terms or Adjectives
<br /> the Contract Documents which amends or
<br /> supplements these General Conditions. 1 . Whenever in the Contract Documents the
<br /> terms "as allowed , " "as approved , " or terms of like
<br /> 45. Supplier—A manufacturer, fabricator, effect or import are used , or the adjectives
<br /> supplier, distributor, materialman , or vendor having a "reasonable, " "suitable, " "acceptable," "proper, "
<br /> direct contract with CONTRACTOR or with any "satisfactory," or adjectives of like effect or import
<br /> Subcontractor to furnish materials or equipment to be are used to describe an action or determination of
<br /> incorporated in the Work by CONTRACTOR or any ENGINEER as to the Work, it is intended that such
<br /> Subcontractor. action or determination will be solely to evaluate, in
<br /> general, the completed Work for compliance with
<br /> 46. Underground Facilities—All underground the requirements of and information in the Contract
<br /> pipelines, conduits, ducts, cables, wires, manholes, Documents and conformance with the design
<br /> vaults, tanks, tunnels, or other such facilities or concept of the completed Project as a functioning
<br /> attachments, and any encasements containing such whole as shown or indicated in the Contract
<br /> facilities, including those that convey electricity, gases, Documents (unless there is a specific statement
<br /> steam, liquid petroleum products, telephone or other indicating otherwise). The use of any such term or
<br /> communications, cable television , water, wastewater, adjective shall not be effective to assign to ENGk
<br /> storm water, other liquids or chemicals, or traffic or NEER any duty or authority to supervise or
<br /> direct
<br /> other control systems. the performance of the Work or any duty or
<br /> authority to undertake responsibility contrary to the
<br /> 47. Unit Price Work—Work to be paid for on provisions of paragraph 9. 10 or any other provision
<br /> the basis of unit prices. of the Contract Documents.
<br /> 48. Work—The entire completed construction
<br /> or the various separately identifiable parts thereof re-
<br /> quired to be provided under the Contract Documents.
<br /> 00700 - General Conditions REV 04.07.doc
<br /> 00700 - 7