Laserfiche WebLink
installation requirements, materials, catalog technique, sequence, or procedure of con- <br /> numbers, and similar information with struction is specifically and expressly called for <br /> respect thereto; by the Contract Documents) or to safety <br /> precautions or programs incident thereto. The <br /> bw all materials with respect to intended review and approval of a separate item as such <br /> use, fabrication , shipping , handling , storage, will not indicate approval of the assembly in <br /> assembly, and installation pertaining to the which the item functions. <br /> performance of the Work; <br /> 3. ENGINEER's review and approval of <br /> c. all information relative to means, Shop Drawings or Samples shall not relieve <br /> methods, techniques, sequences, and CONTRACTOR from responsibility for any <br /> procedures of construction and safety variation from the requirements of the Contract <br /> precautions and programs incident thereto; Documents unless CONTRACTOR has in <br /> and writing called ENGINEER's attention to each <br /> such variation at the time of each submittal as <br /> d . CONTRACTOR shall also have required by paragraph 6. 17. D. 3 and ENGI- <br /> reviewed and coordinated each Shop NEER has given written approval of each such <br /> Drawing or Sample with other Shop variation by specific written notation thereof <br /> Drawings and Samples and with the incorporated in or accompanying the Shop <br /> requirements of the Work and the Contract Drawing or Sample approval; nor will any <br /> Documents. approval by ENGINEER relieve CON- <br /> TRACTOR from responsibility for complying <br /> 2. Each submittal shall bear a stamp or with the requirements of paragraph 6. 17. D. 10 <br /> specific written indication that CONTRACTOR <br /> has satisfied CONTRACTOR's obligations F. Resubmittal Procedures <br /> under the Contract Documents with respect to <br /> CONTRACTOR's review and approval of that 1 . CONTRACTOR shall make correc- <br /> submittal. tions required by ENGINEER and shall return <br /> the required number of corrected copies of <br /> 3. At the time of each submittal, CON= Shop Drawings and submit as required new <br /> TRACTOR shall give ENGINEER specific Samples for review and approval. CON= <br /> written notice of such variations, if any, that the TRACTOR shall direct specific attention in <br /> Shop Drawing or Sample submitted may have writing to revisions other than the corrections <br /> from the requirements of the Contract called for by ENGINEER on previous <br /> Documents, such notice to be in a written com- submittals. <br /> munication separate from the submittal; and , in <br /> addition , shall cause a specific notation to be 6 . 18 Continuing the Work <br /> made on each Shop Drawing and Sample sub= <br /> miffed to ENGINEER for review and approval of A. CONTRACTOR shall carry on the Work and <br /> each such variation . adhere to the progress schedule during all disputes or <br /> disagreements with OWNER. No Work shall be <br /> E. ENGINEER's Review delayed or postponed pending resolution of any <br /> disputes or disagreements, except as permitted by <br /> 1 . ENGINEER will timely review and paragraph 15. 04 or as OWNER and CONTRACTOR <br /> approve Shop Drawings and Samples in may otherwise agree in writing. <br /> accordance with the schedule of Shop <br /> Drawings and Sample submittals acceptable to 6. 19 CONTRACTOR's General Warranty and <br /> ENGINEER. ENGINEER's review and Guarantee <br /> approval will be only to determine if the items <br /> covered by the submittals will, after installation A. CONTRACTOR warrants and guarantees to <br /> or incorporation in the Work, conform to the OWNER, ENGINEER, and ENGINEER's Consultants <br /> information given in the Contract Documents that all Work will be in accordance with the Contract <br /> and be compatible with the design concept of Documents and will not be defective . <br /> the completed Project as a functioning whole as CONTRACTOR's warranty and guarantee hereunder <br /> indicated by the Contract Documents. excludes defects or damage caused by: <br /> 2 . ENGINEER's review and approval 1s abuse, modification , or improper <br /> will not extend to means, methods , techniques, maintenance or operation by persons other <br /> sequences, or procedures of construction than CONTRACTOR, Subcontractors , <br /> (except where a particular means, method , <br /> 00700 - General Conditions REV 04.07.doc <br /> 00700 - 24 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS10545.86Th Ave SR60 to 57th St (Arcadis)WdmimlBid Documents100700 - General Conditions REV 04-07.doc <br />