3 . other property at the Site or adjacent 6 . 16 Emergencies
<br /> thereto, including trees, shrubs, lawns, walks,
<br /> pavements, roadways, structures, utilities, and A. In emergencies affecting the safety or protec-
<br /> Underground Facilities not designated for tion of persons or the Work or property at the Site or
<br /> removal, relocation , or replacement in the adjacent thereto, CONTRACTOR is obligated to act to
<br /> course of construction . prevent threatened damage, injury, or loss.
<br /> CONTRACTOR shall give ENGINEER prompt written
<br /> B . CONTRACTOR shall comply with all applica- notice if CONTRACTOR believes that any significant
<br /> ble Laws and Regulations relating to the safety of changes in the Work or variations from the
<br />Contract
<br /> persons or property, or to the protection of persons or Documents have been caused thereby or are required
<br /> property from damage, injury, or loss; and shall erect as a result thereof. If ENGINEER determines that a
<br /> and maintain all necessary safeguards for such safety change in the Contract Documents is required be-
<br /> and protection . CONTRACTOR shall notify owners of cause of the action taken by CONTRACTOR in
<br /> adjacent property and of Underground Facilities and response to such an emergency, a Work Change
<br /> other utility owners when prosecution of the Work may Directive or Change Order will be issued .
<br /> affect them, and shall cooperate with them in the
<br /> protection , removal, relocation , and replacement of 6 . 17 Shop Drawings and Samples
<br /> their property. All damage, injury, or loss to any
<br /> property referred to in paragraph 6. 13.A.2 or 6. 13.A. 3 A. CONTRACTOR shall submit Shop Drawings
<br /> caused , directly or indirectly, in whole or in part, by to ENGINEER for review and approval in accordance
<br /> CONTRACTOR, any Subcontractor, Supplier, or any with the acceptable schedule of Shop Drawings and
<br /> other individual or entity directly or indirectly employed Sample submittals. All submittals will be identified as
<br /> by any of them to perform any of the Work, or anyone ENGINEER may require and in the number of copies
<br /> for whose acts any of them may be liable, shall be specified in the General Requirements. The
<br /> data
<br /> remedied by CONTRACTOR (except damage or loss shown on the Shop Drawings will be complete with
<br /> ' attributable to the fault of Drawings or Specifications respect to quantities, dimensions, specified perform
<br /> or to the acts or omissions of OWNER or ENGINEER mance and design criteria, materials, and similar data
<br /> or ENGINEER's Consultant, or anyone employed by to show ENGINEER the services, materials, and
<br /> any of them, or anyone for whose acts any of them equipment CONTRACTOR proposes to provide and
<br /> may be liable, and not attributable, directly or to enable ENGINEER to review the information for the
<br /> indirectly, in whole or in part, to the fault or negligence limited purposes required by paragraph 6. 17. E.
<br /> of CONTRACTOR or any Subcontractor, Supplier, or
<br /> other individual or entity directly or indirectly employed B. CONTRACTOR shall also submit Samples to
<br /> by any of them) . CONTRACTOR's duties and ENGINEER for review and approval in accordance
<br /> responsibilities for safety and for protection of the with the acceptable schedule of Shop Drawings and
<br /> Work shall continue until such time as all the Work is Sample submittals. Each Sample will be identified
<br /> completed and ENGINEER has issued a notice to clearly as to material , Supplier, pertinent data such as
<br /> OWNER and CONTRACTOR in accordance with catalog numbers, and the use for which intended and
<br /> paragraph 14. 07. 13 that the Work is acceptable otherwise as ENGINEER may require to enable ENGI-
<br /> (except as otherwise expressly provided in connection NEER to review the submittal for the limited purposes
<br /> with Substantial Completion). required by paragraph 6. 17. E. The numbers of each
<br /> Sample to be submitted will be as specified in the
<br /> 6 . 14 Safety Representative Specifications.
<br /> A. CONTRACTOR shall designate a qualified C. Where a Shop Drawing or Sample is required
<br /> and experienced safety representative at the Site by the Contract Documents or the schedule of Shop
<br /> whose duties and responsibilities shall be the Drawings and Sample submittals acceptable to ENGI-
<br /> prevention of accidents and the maintaining and NEER as required by paragraph 2. 07, any related
<br /> supervising of safety precautions and programs. Work performed prior to ENGINEER's review and
<br /> approval of the pertinent submittal will be at the sole
<br /> 6 . 15 Hazard Communication Programs expense and responsibility of CONTRACTOR.
<br /> A. CONTRACTOR shall be responsible for D. Submittal Procedures
<br /> coordinating any exchange of material safety data
<br /> sheets or other hazard communication information 1 . Before submitting each Shop
<br /> required to be made available to or exchanged be- Drawing or Sample, CONTRACTOR shall have
<br /> tween or among employers at the Site in accordance determined and verified :
<br /> with Laws or Regulations.
<br /> a. all field measurements, quantities ,
<br /> dimensions , specified performance criteria ,
<br /> 00700 - General Conditions REV 0"Tdoc
<br /> 00700 - 23