Laserfiche WebLink
3 . other property at the Site or adjacent 6 . 16 Emergencies <br /> thereto, including trees, shrubs, lawns, walks, <br /> pavements, roadways, structures, utilities, and A. In emergencies affecting the safety or protec- <br /> Underground Facilities not designated for tion of persons or the Work or property at the Site or <br /> removal, relocation , or replacement in the adjacent thereto, CONTRACTOR is obligated to act to <br /> course of construction . prevent threatened damage, injury, or loss. <br /> CONTRACTOR shall give ENGINEER prompt written <br /> B . CONTRACTOR shall comply with all applica- notice if CONTRACTOR believes that any significant <br /> ble Laws and Regulations relating to the safety of changes in the Work or variations from the <br />Contract <br /> persons or property, or to the protection of persons or Documents have been caused thereby or are required <br /> property from damage, injury, or loss; and shall erect as a result thereof. If ENGINEER determines that a <br /> and maintain all necessary safeguards for such safety change in the Contract Documents is required be- <br /> and protection . CONTRACTOR shall notify owners of cause of the action taken by CONTRACTOR in <br /> adjacent property and of Underground Facilities and response to such an emergency, a Work Change <br /> other utility owners when prosecution of the Work may Directive or Change Order will be issued . <br /> affect them, and shall cooperate with them in the <br /> protection , removal, relocation , and replacement of 6 . 17 Shop Drawings and Samples <br /> their property. All damage, injury, or loss to any <br /> property referred to in paragraph 6. 13.A.2 or 6. 13.A. 3 A. CONTRACTOR shall submit Shop Drawings <br /> caused , directly or indirectly, in whole or in part, by to ENGINEER for review and approval in accordance <br /> CONTRACTOR, any Subcontractor, Supplier, or any with the acceptable schedule of Shop Drawings and <br /> other individual or entity directly or indirectly employed Sample submittals. All submittals will be identified as <br /> by any of them to perform any of the Work, or anyone ENGINEER may require and in the number of copies <br /> for whose acts any of them may be liable, shall be specified in the General Requirements. The <br /> data <br /> remedied by CONTRACTOR (except damage or loss shown on the Shop Drawings will be complete with <br /> ' attributable to the fault of Drawings or Specifications respect to quantities, dimensions, specified perform <br /> or to the acts or omissions of OWNER or ENGINEER mance and design criteria, materials, and similar data <br /> or ENGINEER's Consultant, or anyone employed by to show ENGINEER the services, materials, and <br /> any of them, or anyone for whose acts any of them equipment CONTRACTOR proposes to provide and <br /> may be liable, and not attributable, directly or to enable ENGINEER to review the information for the <br /> indirectly, in whole or in part, to the fault or negligence limited purposes required by paragraph 6. 17. E. <br /> of CONTRACTOR or any Subcontractor, Supplier, or <br /> other individual or entity directly or indirectly employed B. CONTRACTOR shall also submit Samples to <br /> by any of them) . CONTRACTOR's duties and ENGINEER for review and approval in accordance <br /> responsibilities for safety and for protection of the with the acceptable schedule of Shop Drawings and <br /> Work shall continue until such time as all the Work is Sample submittals. Each Sample will be identified <br /> completed and ENGINEER has issued a notice to clearly as to material , Supplier, pertinent data such as <br /> OWNER and CONTRACTOR in accordance with catalog numbers, and the use for which intended and <br /> paragraph 14. 07. 13 that the Work is acceptable otherwise as ENGINEER may require to enable ENGI- <br /> (except as otherwise expressly provided in connection NEER to review the submittal for the limited purposes <br /> with Substantial Completion). required by paragraph 6. 17. E. The numbers of each <br /> Sample to be submitted will be as specified in the <br /> 6 . 14 Safety Representative Specifications. <br /> A. CONTRACTOR shall designate a qualified C. Where a Shop Drawing or Sample is required <br /> and experienced safety representative at the Site by the Contract Documents or the schedule of Shop <br /> whose duties and responsibilities shall be the Drawings and Sample submittals acceptable to ENGI- <br /> prevention of accidents and the maintaining and NEER as required by paragraph 2. 07, any related <br /> supervising of safety precautions and programs. Work performed prior to ENGINEER's review and <br /> approval of the pertinent submittal will be at the sole <br /> 6 . 15 Hazard Communication Programs expense and responsibility of CONTRACTOR. <br /> A. CONTRACTOR shall be responsible for D. Submittal Procedures <br /> coordinating any exchange of material safety data <br /> sheets or other hazard communication information 1 . Before submitting each Shop <br /> required to be made available to or exchanged be- Drawing or Sample, CONTRACTOR shall have <br /> tween or among employers at the Site in accordance determined and verified : <br /> with Laws or Regulations. <br /> a. all field measurements, quantities , <br /> dimensions , specified performance criteria , <br /> 00700 - General Conditions REV 0"Tdoc <br /> 00700 - 23 <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS10545.66Th Ave SR60 to 57th St (Arcadis)Wdmim\Bid Documents100700 - General Conditions REV 0"7.doc <br />