My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:03:03 PM
Creation date
10/1/2015 5:01:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227C
Agenda Item Number
12.I.2
Entity Name
Dickerson Florida Inc.
Subject
Contract Documents and Specifications
66th Avenue Roadway Improvements
Area
SR 60 to North of 49th Street
Project Number
0545 & 0370
Bid Number
2013008
Supplemental fields
SmeadsoftID
11696
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
performed by utility owners. If such other work is not <br /> noted in the Contract Documents, then: 1 . the individual or entity who will have <br /> authority and responsibility for coordination of <br /> 1 . written notice thereof will be given to the activities among the various contractors will <br /> CONTRACTOR prior to starting any such other be identified; <br /> work; and <br /> 24 the specific matters to be covered by <br /> 2. if OWNER and CONTRACTOR are such authority and responsibility will be <br /> unable to agree on entitlement to or on the itemized; and <br /> amount or extent, if any, of any adjustment in <br /> the Contract Price or Contract Times that 3w the extent of such authority and <br /> should be allowed as a result of such other responsibilities will be provided . <br /> work, a Claim may be made therefor as <br /> provided in paragraph 10. 05. B. Unless otherwise provided in the <br /> Supplementary Conditions, OWNER shall have sole <br /> B. CONTRACTOR shall afford each other authority and responsibility for such coordination . <br /> contractor who is a party to such a direct contract and <br /> each utility owner (and OWNER, if OWNER is per- <br /> forming the other work with OWNER's employees) ARTICLE 8 - OWNER'S RESPONSIBILITIES <br /> proper and safe access to the Site and a reasonable <br /> opportunity for the introduction and storage of <br /> materials and equipment and the execution of such & 01 Communications to Contractor <br /> other work and shall properly coordinate the Work with <br /> theirs. Unless otherwise provided in the Contract A. Except as otherwise provided in these <br /> Documents, CONTRACTOR shall do all cutting , General Conditions, OWNER shall issue all communi- <br /> fitting, and patching of the Work that may be required cations to CONTRACTOR through ENGINEER. <br /> to property connect or otherwise make its several <br /> parts come together and property integrate with such 8. 02 Replacement of ENGINEER <br /> other work. CONTRACTOR shall not endanger any <br /> work of others by cutting , excavating, or otherwise A. In case of termination of the employment of <br /> altering their work and will only cut or alter their work ENGINEER, OWNER shall appoint an engineer to <br /> with the written consent of ENGINEER and the others whom CONTRACTOR makes no reasonable <br /> whose work will be affected . The duties and objection , whose status under the Contract <br /> responsibilities of CONTRACTOR under this Documents shall be that of the former ENGINEER. <br /> paragraph are for the benefit of such utility owners and <br /> other contractors to the extent that there are 8. 03 Furnish Data <br /> comparable provisions for the benefit of <br /> CONTRACTOR in said direct contracts between A. OWNER shall promptly furnish the data <br /> OWNER and such utility owners and other required of OWNER under the Contract Documents. <br /> contractors. <br /> 8. 04 Pay Promptly When Due <br /> Co If the proper execution or results of any part of <br /> CONTRACTOR's Work depends upon work per- A. OWNER shall make payments to CONTRAC- <br /> formed by others under this Article 7, CONTRACTOR TOR promptly when they are due as provided in <br /> shall inspect such other work and promptly report to paragraphs 14. 02. 0 and 14. 07.C. <br /> ENGINEER in writing any delays, defects, or deficien- <br /> cies in such other work that render it unavailable or 8 . 05 Lands and Easements; Reports and Tests <br /> unsuitable for the proper execution and results of <br /> CONTRACTOR's Work. CONTRACTOR's failure to A. OWNER's duties in respect of providing lands <br /> so report will constitute an acceptance of such other and easements and providing engineering surveys to <br /> work as fit and proper for integration with establish reference points are set forth in paragraphs <br /> CONTRACTOR's Work except for latent defects and 4. 01 and 4. 05. Paragraph 4.02 refers to OWNER's <br /> deficiencies in such other work. identifying and making available to CONTRACTOR <br /> copies of reports of explorations and tests of <br /> 7. 02 Coordination subsurface conditions and drawings of physical <br /> conditions in or relating to existing surface or <br /> A. If OWNER intends to contract with others for subsurface structures at or contiguous to the Site that <br /> the performance of other work on the Project at the have been utilized by ENGINEER in preparing <br />the <br /> Site, the following will be set forth in Supplementary Contract Documents. <br /> Conditions: <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 26 <br /> PxPublic WorksIENGINEERING DIVISION PROJECTS%0545-66Th Ave SR60 to 57th St (Arcadis)Wdmirn0d Documents%00700 - General Conditions REV 04-07.doo <br />
The URL can be used to link to this page
Your browser does not support the video tag.