Laserfiche WebLink
8 . 06 Insurance <br /> 9 . 02 Visits to Site <br /> A. OWNER's responsibilities, if any, in respect to <br /> purchasing and maintaining liability and property insur- A. ENGINEER will make visits to the Site at <br /> ance are set forth in Article 5. intervals appropriate to the various stages of construc- <br /> tion as ENGINEER deems necessary in order to <br /> 8 . 07 Change Orders observe as an experienced and qualified design <br /> professional the progress that has been made and the <br /> A. OWNER is obligated to execute Change quality of the various aspects of CONTRACTOR's <br /> Orders as indicated in paragraph 10 . 03 . executed Work. Based on information obtained <br /> during such visits and observations, ENGINEER, for <br /> 8. 08 Inspections, Tests, and Approvals the benefit of OWNER, will determine, in general, if <br /> the Work is proceeding in accordance with the Con- <br /> A. OWNER's responsibility in respect to certain tract Documents. ENGINEER will not be required to <br /> inspections, tests, and approvals is set forth in make exhaustive or continuous inspections on the Site <br /> paragraph 13. 03. 6. to check the quality or quantity of the Work. <br /> ENGINEER's efforts will be directed toward providing <br /> 8 . 09 Limitations on OWNER's Responsibilities for OWNER a greater degree of confidence that the <br /> completed Work will conform generally to the Contract <br /> A. The OWNER shall not supervise, direct, or Documents. On the basis of such visits and <br /> have control or authority over, nor be responsible for, observations, ENGINEER will keep OWNER informed <br /> CONTRACTOR's means, methods, techniques, se- of the progress of the Work and will endeavor to guard <br /> quences, or procedures of construction , or the safety OWNER against defective Work. <br /> precautions and programs incident thereto, or for any <br /> failure of CONTRACTOR to comply with Laws and B. ENGINEER's visits and observations are <br /> =Regulations applicable to the performance of the subject to all the limitations on ENGINEER's authority <br /> Work. OWNER will not be responsible for and responsibility set forth in paragraph 9. 10, and <br /> CONTRACTOR's failure to perform the Work in particularly, but without limitation, during or as a result <br /> accordance with the Contract Documents. of ENGINEER's visits or observations of <br /> CONTRACTOR's Work ENGINEER will not <br /> 8 . 10 Undisclosed Hazardous Environmental supervise, direct, control , or have authority over or be <br /> Condition responsible for CONTRACTOR's means, methods, <br /> techniques, sequences, or procedures of construction , <br /> A. OWNER's responsibility in respect to an or the safety precautions and programs incident <br /> undisclosed Hazardous Environmental Condition is thereto, or for any failure of CONTRACTOR to comply <br /> set forth in paragraph 4. 06. with Laws and Regulations applicable to the <br /> performance of the Work. <br /> 8. 11 Evidence of Financial Arrangements <br /> 9 . 03 Project Representative <br /> A. If and to the extent OWNER has agreed to <br /> furnish CONTRACTOR reasonable evidence that A. If OWNER and ENGINEER agree, ENGI- <br /> financial arrangements have been made to satisfy NEER will fumish a Resident Project Representative <br /> OWNER's obligations under the Contract Documents, to assist ENGINEER in providing more extensive <br /> OWNER's responsibility in respect thereof will be as observation of the Work. The responsibilities and <br /> set forth in the Supplementary Conditions. authority and limitations thereon of any such Resident <br /> Project Representative and assistants will be as <br /> provided in paragraph 9. 10 and in the Supplementary <br /> ARTICLE 9 - ENGINEER'S STATUS DURING Conditions. If OWNER designates another represen- <br /> CONSTRUCTION tative or agent to represent OWNER at the Site who is <br /> not ENGINEER's Consultant, agent or employee, the <br /> responsibilities and authority and limitations thereon of <br /> 9 . 01 OWNER'S Representative such other individual or entity will be as provided in the <br /> Supplementary Conditions. <br /> A. ENGINEER will be OWNER's representative <br /> during the construction period . The duties and 9 . 04 Clarifications and Interpretations <br /> responsibilities and the limitations of authority of <br /> ENGINEER as OWNER Is representative during A. ENGINEER will issue with reasonable <br /> construction are set forth in the Contract Documents promptness such written clarifications or interpreta- <br /> and will not be changed without written consent of tions of the requirements of the Contract Documents <br /> OWNER and ENGINEER. as ENGINEER may determine necessary, which shall <br /> 00700 - General Conditions REV 0407.doc <br /> 00700 - 27 <br /> F:Wublic WorksIENGINEERING DIVISION PROJECTM0545.66Th Ave SR60 to 57th St (Arcadis)1AdmimtBid Documents100700 - General Conditions REV 04-07.doc <br /> I <br />