Laserfiche WebLink
C . Evidence of Insurance: CONTRACTOR shall not commence work under this <br /> Contract until he has obtained all insurance required under Article 5 and such <br /> insurance has been delivered to the OWNER and approved by the OWNER, nor <br /> shall the CONTRACTOR allow any Subcontractor to commence work on his <br /> subcontract until all similar insurance required of the Subcontractor has been so <br /> obtained and approved . All such insurance shall remain in effect until final <br /> payment and at all times thereafter when CONTRACTOR may be correcting , <br /> removing or replacing defective Work in accordance with Article 13, <br /> SC -2.06 Preconstruction Conference <br /> SC-2 . 06 Delete paragraph GC-2. 06. A in its entirety and insert the following paragraph in its <br /> place: <br /> A. Immediately after awarding the contract, but before the CONTRACTOR begins <br /> work , the Project Manager will call a preconstruction conference at a place the <br /> ENGINEER designates to establish an understanding among the parties as to <br /> the work and to discuss schedules referred to in paragraph 2 . 05. 8, procedures <br /> for handling Shop Drawings and other submittals , and maintaining required <br /> records . Utility companies and others as appropriate will be requested to attend <br /> to discuss and coordinate work. <br /> Be Per the f3DOT Standard Specifications for Road and Bridge Construction , the <br /> Contractor will certify to the Engineer the following : <br /> 1 . A listing of on-site clerical staff, supervisory personnel and their pro-rated <br /> time assigned to the contract, <br /> 2 . Actual Rate for items listed in Table 4-3 . 2 . 1 (see below) , <br /> 3 . Existence of employee benefit plan for Holiday, Sick and Vacation benefits <br /> and a Retirement Plan , and , <br /> 4 . Payment of Per Diem is a company practice for instances when <br /> compensation for Per Diem is requested . <br /> Such certification must be made by an officer or director of the Contractor with <br /> authority to bind the Contractor. Timely certification is a condition precedent to <br /> any right of the Contractor to recover compensations for such costs, and failure <br /> to timely submit the certification will constitute a full , complete, absolute and <br /> irrevocable waiver by the Contractor of any right to recover such costs . Any <br /> subsequent changes shall be certified to the Engineer as part of the cost <br /> proposal or seven calendar days in advance of performing such extra work. <br /> FDOT Table 4-3 . 2 . 1 <br /> Item Rate <br /> FICA Rate established by Law <br /> FUTA/SUTA Rate established by Law <br /> Medical Insurance Actual <br /> Holidays, Sick & Vacation Benefits Actual <br /> Retirement Benefits Actual <br /> Rates based on the National Council on <br /> Compensation Insurance basic rates tables <br /> Workers Compensation adjusted by Contractor's actual experience <br /> modification factor in effect at the time of the <br /> additional work or unforeseen work <br /> Per Diem Actual but not to exceed State of Florida's rate <br /> Insurance" Actual <br /> "Compensation for Insurance is limited solely to General Liability Coverage and does not include any other <br /> V <br /> nsurance coverage (such as, but not limited to , Umbrella Coverage, Automobile Insurance, etc.) . <br /> 00800-2 <br /> 00800 - Supplementary Conditions 10-12 rev.doc <br /> 00800 2F:\Public WorkMENGINEERING DIVISION PROJECTS\0545.6Th Ave SR60 to 57th St (Arcedla)Wdmtm\Bid Dxuments\00800 - Supplementary Conditions i0A2 <br /> rev.doc <br />