My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:03:03 PM
Creation date
10/1/2015 5:01:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227C
Agenda Item Number
12.I.2
Entity Name
Dickerson Florida Inc.
Subject
Contract Documents and Specifications
66th Avenue Roadway Improvements
Area
SR 60 to North of 49th Street
Project Number
0545 & 0370
Bid Number
2013008
Supplemental fields
SmeadsoftID
11696
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -3. 06 Coordination of Plans, Specifications, and Special Provisions <br /> SC-3 . 06 Add the following new paragraphs immediately after paragraph GG3. 05. <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 . Addenda <br /> 3 . Specifications <br /> 4 . Supplementary Conditions to the General Conditions <br /> 5 . General Conditions <br /> 6. Approved Shop Drawings <br /> 7 . Drawings <br /> 8 . Referenced Standards . <br /> Be Writtenlcomputed dimensions shall govern over scaled dimensions . <br /> SC=4. 02 Subsurface and Physical Conditions <br /> SC 4 . 02 Add the following new paragraphs immediately after paragraph GC=4. 02. 6: <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER's <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site: <br /> Geotechnical Engineering Services Report for 66th Avenue Improvements <br /> (By Tierra) <br /> D . Reports and drawings itemized in SC=4. 02. 0 are not included with the Bidding <br /> Documents . Copies may be examined at Indian River County Administration <br /> Building , Public Works, 1801 27"' Street, Vero Beach , FL 32960 during <br /> regular business hours. These reports and drawings are not part of the Contract <br /> Documents . <br /> SC -5. 01 Performance, Payment and Other Bonds <br /> SC-5 . 01 .A. Delete paragraph GC-5. 01 . A in its entirety and insert the following paragraphs in its <br /> place. <br /> Within fifteen ( 15) days of receipt of the Contract Documents for execution , the <br /> CONTRACTOR shall furnish a Public Construction Bond in an amount <br /> equal to 100% of the Contract Price . <br /> 1 . In lieu of the Public Construction Bond , the CONTRACTOR may furnish <br /> an alternative form of security in the form of cash , money order, certified <br /> check, cashier's check, irrevocable letter of credit or a security as listed in <br /> Part 11 of F . S. Chapter 625 . Any such alternative form of security shall be <br /> for the same purpose , and be for the same amount and subject to the <br /> same conditions as those applicable to the bond otherwise required . The <br /> determination of the value of an alternative form of security shall be made <br /> by the OWNER . <br /> 2 . Such Bond shall continue in effect for one ( 1 ) year after Final Acceptance <br /> of the Work by the OWNER . <br /> 3 . The OWNER shall record , the Public Construction Bond with the Public <br /> 00800-3 <br /> 00800 = Supplementary Conditions 10-12 rev.doc <br /> 00800 31FAPublic Works\ENGINEERING DIVISION PROJECTS10545*WTh Ave SR60 to 57th St (AroadisWmimlBid Documents=Mw- Supplementary Conditions 10.12 <br /> rev.doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.