Laserfiche WebLink
Please note that not to exceed 120 total calendar days will apply to both <br /> closing alternatives ( i . e . Alternative 1 , closings 33rd St, 41St St. and 49th St. <br /> cannot exceed 120 calendar days total ) . <br /> G . PENALTIES FOR NONCOMPLIANCE WITH THIS SECTION : <br /> If the road closing criteria mentioned above is not strictly adhered too , the <br /> Contractor will be assessed liquidated damages for delay in the amount of <br /> $ 6 , 584. 0 for each calendar day that expires after the time specified in <br /> paragraph F . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 102- 1 - Maintenance of Traffic - Lump Sum <br /> SECTION — 104 - EROSION CONTROL AND TREATMENT OF DEWATERING <br /> WATER AND STORMWATER FROM THE. CONSTRUCTION SITE <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area . The pollution control <br /> measures shall prevent turbid or otherwise polluted waters from being discharged from <br /> the construction site or work area , to undeveloped portions of the site or off-site . <br /> B . The OWNER considers pollution from dewatering water and stormwater runoff from a <br /> construction site or work area to be a very serious offense . The CONTRACTOR is <br /> solely responsible for preventing pollution caused by dewatering water and stormwater <br /> runoff from the construction site or work area . <br /> C . The pollution control measures specified herein represent minimum standards to be <br /> adhered to by the CONTRACTOR throughout the Project's construction . The OWNER <br /> reserves the right to require the CONTRACTOR to employ additional pollution control <br /> measures , when in the sole opinion of the OWNER , they are warranted . If site specific <br /> conditions require additional erosion and stormwater pollution control measures during <br /> any phase of construction or operation to prevent erosion or to control sediment or other <br /> pollution , beyond those specified in the Drawings or herein , implement additional best <br /> management practices as necessary, in accordance with Chapter 4 , " Best Management <br /> Practices for Erosion and Sedimentation Control" of the Florida Erosion and Sediment <br /> Control Inspector's Manual , and other references as may be required by regulatory <br /> permits . (http://www. dep. state. fl. us./water/nonpoint/docs/erosion/erosion-inspectors- <br /> manuaL pdo <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br /> Section . Alternatively, the OWNER may halt the CONTRACTOR's operations until the <br /> 01025-2 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (ArcadIs)Wdmim\Bid Documents\Technical <br /> (Znarifirafinna rine <br /> _ Il <br />