My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:03:03 PM
Creation date
10/1/2015 5:01:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227C
Agenda Item Number
12.I.2
Entity Name
Dickerson Florida Inc.
Subject
Contract Documents and Specifications
66th Avenue Roadway Improvements
Area
SR 60 to North of 49th Street
Project Number
0545 & 0370
Bid Number
2013008
Supplemental fields
SmeadsoftID
11696
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR is in full compliance with this , Section , If the OWNER halts the <br /> CONTRACTOR' s work as a result of its failure to comply with this Section , the <br /> Construction Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter 4 - " Best Management Practices <br /> for Erosion and Sedimentation Control " and Chapter 5 — " Best Management Practices <br /> for Dewatering " of the Florida Erosion and Sediment Control Inspector's Manual . In the <br /> event of a conflict between the referenced Chapters and these Specifications , the more <br /> stringent requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph SC-6 . 08 of the Supplementary Conditions . Per paragraph SC-6 . 08 . 0 of <br /> the Supplementary Conditions , the CONTRACTOR shall apply for, obtain , and pay <br /> for all other required permits , licenses , sampling , and tests . Permits the <br /> CONTRACTOR may need to secure may include but not be limited to : <br /> 1 . Long-term and/or short-term dewatering permit as required by the St. Johns <br /> River Water Management District (SJRWMD) . Generally, only the short-term <br /> permit is required . Contact SJRWMD at (321 .) 9844940 to determine which <br /> permit is required and the associated statutory requirements ; <br /> 2 . SJRWMD RDS-50 Permit (required) ; <br /> 3 . The State of Florida Generic Permit for Stormwater Discharge From Large <br /> and Small Construction Activities (required ) . Contact the Florida <br /> Department of Environmental Protection ( FDEP) at (866) 336-6312 (toll <br /> free) or (850) 245-7522 or www. dep . state .fl . us/water/stormwater/npdes/ <br /> 4 . FDEP 's Uncontaminated Groundwater Release Permit (required if <br /> dewatering occurs) . This permit requires water quality testing by a State <br /> certified laboratory . <br /> B . Provide copies of all permits to the OWNER and ENGINEER and comply with all <br /> conditions contained in all permits at no extra cost to the OWNER . If there is a conflict <br /> between any permit requirement and these Specifications , the more stringent <br /> specification or requirement shall govern . <br /> C . In addition to paying for all permit fees , CONTRACTOR shall also pay for all water <br /> quality sampling and laboratory tests required by any permit. <br /> 1 . 3 GENERAL <br /> A. Do not begin any other construction work until the pollution control and treatment <br /> system has been constructed in accordance with approved plans and permits and <br /> approved for use by the OWNER and applicable permitting authorities . <br /> B . From time to time , the OWNER or ENGINEER will inspect the pollution control and <br /> treatment system and may take effluent samples for analysis by a testing laboratory <br /> selected and paid for by the OWNER . If at any time , the OWNER or ENGINEER <br /> determines that the pollution control and treatment system is not in compliance with <br /> the approved system , the OWNER or ENGINEER will shut the portion of the project <br /> down that is not in compliance , and it shall remain shut-down until the pollution <br /> 010254 Technical Specifications <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)\Admim\Bid Documents\Technical <br />
The URL can be used to link to this page
Your browser does not support the video tag.