Laserfiche WebLink
control and treatment system is properly constructed or repaired , and complies with <br /> the approved pollution control and treatment system plans and specifications . <br /> C . Schedule construction to minimize erosion and stormwater runoff from the <br /> construction site . Implement erosion control measures on disturbed areas as soon <br /> as practicable in portions of the site where construction activities have temporarily or <br /> permanently ceased , but in no case more than 7 days after the construction activity <br /> in that portion of the site has temporarily or permanently ceased . In addition to <br /> other temporary erosion control measures that may be implemented , application of <br /> polyacrylamide is required on all such disturbed areas within 7 days after the <br /> construction activity in that portion of the site has temporarily or permanently <br /> ceased , unless final landscaping has been installed . Polyacrylamide application <br /> shall be as specified herein . <br /> D . Inspect each pollution control system at least once per day and after each rainfall <br /> event. Clean and maintain each pollution control system as required by its <br /> manufacturer or the OWNER , until the system is no longer needed . If a water <br /> quality violation occurs , immediately cease all work contributing to the water quality <br /> violation and correct the problem . <br /> E . Discharge shall not violate State or local water quality standards in the receiving <br /> waters , nor cause injury to the public health or to public or private property, nor to <br /> the Work completed or in progress . The receiving point for water from construction <br /> operations shall be approved by the applicable owner, regulatory agency, and the <br /> ENGINEER . <br /> F . Promptly repair all damage at no cost to the OWNER . <br /> 1 .4 SUBMITTALS <br /> A. Shop Drawings : Submit shop drawings of the proposed pollution control and treatment <br /> systems in accordance with Section 1340 . <br /> B . Stormwater Pollution Prevention Plan . <br /> 1 . 5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br /> REQUIRED FOR INSTALLATION , AND MAINTENANCE <br /> A. State Certified Erosion Control Specialty Subcontractor is Required for Installation <br /> and Maintenance : Installation and maintenance of all erosion and stormwater <br /> pollution control devices , shall be by a State Certified erosion control subcontractor <br /> who specializes in the installation and maintenance of such devices . After <br /> installation , this specialty subcontractor shall maintain the erosion and stormwater <br /> pollution control devices until in the ENGINEER' s sole opinion , the devices are no <br /> longer necessary (such time not to extend past the date the OWNER formally <br /> accepts the project as complete) . Before beginning construction , submit to Indian <br /> River County for review and approval , a Stormwater Pollution Prevention Plan <br /> (SWPPP) , prepared by the certified erosion control subcontractor. Construction <br /> shall not begin until the SWPPP has been approved by Indian River County . <br /> 010254 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)Wdmim\Bid Documents\Technical <br />