Laserfiche WebLink
Bid Item No . 536-73 — Guardrail Removal — Per Linear Foot <br /> Bid Item No . 536-8X-XX — Guardrail Anchorage — Per Each <br /> SECTION - 538 — RESETTING GUARDRAIL <br /> The work specified in this item shall conform to Section 538 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010) . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 538- 1 — Guardrail Reset — Per Linear Foot <br /> SECTION - 570 — PERFORMANCE TURF <br /> The work specified in this item shall conform to Section 570 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010) . <br /> A . Description : Sod for the project shall be of the variety that is common to the area <br /> and of a variety approved by the Engineer. This work shall also include mowing in <br /> accordance with Section 104-7 . 2 , to be mowed at 6" height with a mulching mower. <br /> B . Work Included : Scope of Work : The work specified in this section consists of the <br /> establishing of a stand of grass , within the project, right-of-way, easements , and other <br /> areas indicated on the Drawings , by furnishing and placing grass sod . Also included <br /> are fertilizing , watering and maintenance as required to assure a healthy stand of <br /> grass . Two applications of fertilizer will be required with the initial application being <br /> fertilizer and the second application being "weed and feed " . <br /> C . Guarantee : All sodded areas shall be guaranteed for three months after date of final <br /> acceptance . <br /> Replacement of Defective Sod : Any dead sod or sod showing (less than 95% of a <br /> square) indication of probable non survival or lack of health and vigor, or which do not <br /> exhibit the characteristics to meet specifications , shall be replaced within two weeks of <br /> notice from Owner or Engineer. All replacement sod shall be furnished/installed at no <br /> additional cost to the Owner and shall be guaranteed for three months after final <br /> completion and acceptance . All replacement shall meet original specifications . <br /> The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br /> guarantee period and such guarantee shall be extended until notification is received . <br /> At the end of the guarantee period , all sod that is dead or in unsatisfactory growth shall <br /> be replaced within two weeks . <br /> D . Fertilizer: Commercial fertilizers shall comply with the state fertilizer laws . <br /> The numerical designations for fertilizer indicate the minimum percentages <br /> ( respectively) of ( 1 ) total nitrogen , (2) available phosphoric acid and (3) water-soluble <br /> potash contained in the fertilizer. <br /> The chemical designation of the fertilizer shall be 164-8 . Fertilizer shall include iron , <br /> minor nutrients and trace elements . At least 50 percent of the nitrogen shall be derived <br /> 0102548 Technical Specifications <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)\Hdmim\Bid Documents\Technical <br /> - l <br />