My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:03:03 PM
Creation date
10/1/2015 5:01:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227C
Agenda Item Number
12.I.2
Entity Name
Dickerson Florida Inc.
Subject
Contract Documents and Specifications
66th Avenue Roadway Improvements
Area
SR 60 to North of 49th Street
Project Number
0545 & 0370
Bid Number
2013008
Supplemental fields
SmeadsoftID
11696
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
from organic sources . At least 50 percent of the phosphoric acid shall be from normal <br /> super phosphate or an equivalent source which will provide a minimum of two units of <br /> sulfur. The amount of sulfur shall be indicated on the quantitative analysis card <br /> attached to each bag or other container. <br /> Contractor shall ensure 1 pound of nitrogen per 1 , 000 square feet . <br /> E . Water for Grassing : Contractor shall provide the water used in the sodding <br /> operations as necessary to meet the requirements of Article 570-5 and 2 . 34 . 13 . <br /> F . Preparation of Ground : The area over which the sod is to be placed shall be <br /> scarified or loosened to a depth and then raked smooth and free from debris . Where <br /> the soil is sufficiently loose and clean , the Owner, at his discretion , may authorize the <br /> elimination of ground preparation . <br /> G . Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a <br /> range of 6 . 0 an 7 . 0 . <br /> Contractor shall apply two (2) applications . The initial shall be fertilizer and the second <br /> application shall be "weed and feed " . <br /> The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds <br /> per acre , or 10 pounds per 1 , 000 square feet, by a spreading device capable of <br /> uniformly distributing the material at the specified rate . <br /> Contractor shall apply applications as per manufacturer's specification . All tickets from <br /> bags shall be handed over to the County Inspector. <br /> On steep slopes , where the use of a machine for spreading or mixing is not <br /> practicable , the fertilizer shall be spread by hand and raked in and thoroughly mixed <br /> with the soil to a depth of approximately 2 inches . <br /> H . Placing Sod : The sod shall be placed on the prepared surface , with edges in close <br /> contact and shall be firmly and smoothly embedded by light tamping with appropriate <br /> tools . <br /> Where sodding is used in drainage ditches , the setting of the pieces shall be staggered <br /> so as to avoid a continuous seam along the line of flow. Along the edges of such <br /> staggered areas , the offsets of individual strips shall not exceed 6 inches . In order to <br /> prevent erosion caused by vertical edges at the outer limits , the outer pieces of sod <br /> shall be tamped so as to produce a featheredge effect . <br /> Where sodding is placed abutting paved shoulder, the contractor is to ensure that the <br /> finished sod elevation is 1 '/s" below paved shoulder. <br /> On slopes greater than 3 : 1 , the Contractor shall prevent the sod from sliding by means <br /> of wooden pegs driven through the sod blocks into firm earth , at suitable intervals . <br /> Sodding shall not be performed when weather and soil conditions are , in the <br /> Engineer's opinion , unsuitable for proper results . <br /> Sod shall be placed around all structures , equipment pads , etc . <br /> I . Watering : The areas on which the sod is to be placed shall contain sufficient moisture , <br /> as determined by the Engineer, for optimum results . After being placed , the sod shall <br /> be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks . <br /> Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br /> grow for a minimum of 60 days (or until final acceptance , whichever is latest) . <br /> 0102549 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\054"6Th Ave SR60 to 57th St (Arcadis)\Admim\Bid Documents\Technical <br />
The URL can be used to link to this page
Your browser does not support the video tag.