My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-265
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2016 1:21:41 PM
Creation date
10/1/2015 1:26:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/2010
Control Number
2010-265
Agenda Item Number
12.I.1
Entity Name
Dickerson Florida Inc.
Subject
Contract 53rd Street Roadways Improvements
Area
IRFWCD Lateral H Canal to Indian River Boulevard
Project Number
0107
Bid Number
2011011
Supplemental fields
SmeadsoftID
9118
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01611 <br /> STORAGE OF MATERIAL AND EQUIPMENT <br /> 1 . 1 GENERAL <br /> A . Store and protect materials and equipment in accordance with manufacturer' s <br /> recommendations and requirements of Specifications . <br /> B . Make all arrangements and provisions necessary for the storage of materials <br /> and equipment . Place all excavated materials , construction equipment , and <br /> materials and equipment to be incorporated into the Work , so as not to injure <br /> any part of the Work or existing facilities , and so that free access can be had at <br /> all times to all parts of the Work and to all public utility installations in the vicinity <br /> of the Work . Keep materials and equipment neatly and compactly stored in <br /> locations that will cause a minimum of inconvenience to other contractors , <br /> public travel , adjoining owners , tenants and occupants . Arrange storage in a <br /> manner to provide easy access for inspection . <br /> C . Areas available on the construction site for storage of material and equipment <br /> shall be as shown or approved by the ENGINEER . <br /> D . Store materials and equipment which are to become the property of the <br /> OWNER to facilitate their inspection and insure preservation of the quality and <br /> fitness of the Work , including proper protection against damage by extreme <br /> temperatures and moisture . <br /> E . Do not use lawns , grass plots or other private property for storage purposes <br /> without written permission of the OWNER or other person in possession or <br /> control of such premises . <br /> F . CONTRACTOR shall be fully responsible for loss or damage to stored <br /> materials and equipment . <br /> G . Do not open manufacturers containers until time of installation unless <br /> recommended by the manufacturer or otherwise specified . <br /> H . When appropriate store materials on wood blocking so there is no contact with <br /> the ground . <br /> + + END OF SECTION + + <br /> 01611 - 1 01611 —Storage of Material <br /> F :\Engineering\Capital Projects\0107-53rd St, 58th Ave- US # 1 \Contract Documents\01611 - Storage of Materials . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.