My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:05:06 PM
Creation date
10/1/2015 5:05:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227C.1
Agenda Item Number
12.I.2
Entity Name
Dickerson, Florida Inc.
Subject
Addendum No.1
66th Avenue Roadway Improvments
Area
SR 60 to North of 49th Street
Bid Number
2013008
Supplemental fields
SmeadsoftID
11698
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIFICATIONS / CORRECTIONSMESTIONS AND RESPONSES <br /> The following questions (with responses ) were received after the Mandatory Pre- Bid Meeting on <br /> November 7th, 2012 : <br /> QUESTION NO. 1 <br /> There is no existing grade center line on the profile view of the ditch at the 37th Street Bridge . This is <br /> necessary for channel excavation quantities . <br /> ANSWER NO. 1 <br /> The Bridge Plans do not show the center line grade of the canal . We are not anticipating any major <br /> excavation of the canal to place the rip-rap . Please refer to the Roadway Plans cross-sections sheets <br /> for the existing canal sections. <br /> QUESTION NO. 2 <br /> Is there anyway you can break out channel excavation from rip- rap, and or provide quantities for <br /> channel excavation . <br /> ANSWER NO. 2 <br /> It is our understanding that the above question is also referring to the Bridge Plans and specifically <br /> Pay Item 530-3-3 "( Rock Rubble) (Canal Excavation as required shall be included in the cost of the rock <br /> rubble )" . The canal excavation in this case will be an incidental item to placing Rip- Rap upstream and <br /> downstream of the bridge. Please refer to cross-sections within the Roadway Plans for the Lateral A <br /> canal and sub -lateral canal elevations. <br /> QUESTION NO. 3 <br /> There is a standard plan view for 33 `d, 37th, 45th, and 49th that gives a 96' x 24' runs of rip rap lined <br /> ditches . The section views of the rip rap are standard on all of the bridges. That being said, there are <br /> huge changes in rip- rap quantities between the bridges ( i . e. 33`d Bridge 750 TN , 37th Bridge 1250 TN ) . <br /> Could there be an error in the quantities ? <br /> ANSWER NO. 3 <br /> It does not appear that there is an error in the quantities for Rip- Rap Rubble. The quantities for Rip- <br /> Rap for the new bridges designed by Bridge Design are as follows : <br /> Sheet B14; 33`d Street Bridge 11383 TN <br /> Sheet 1324; 37th Street Bridge 11268 TN <br /> Sheet B34; 45th Street Bridge 11232 TN <br /> Sheet 644; 49th Street Bridge 11320 TN <br /> Page 2 of 6 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)\Admim\Bid Documents\Addendum # I \Addendum No. 1 <br /> 11 -9- 12.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.