My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:05:06 PM
Creation date
10/1/2015 5:05:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227C.1
Agenda Item Number
12.I.2
Entity Name
Dickerson, Florida Inc.
Subject
Addendum No.1
66th Avenue Roadway Improvments
Area
SR 60 to North of 49th Street
Bid Number
2013008
Supplemental fields
SmeadsoftID
11698
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NO. 4 <br /> In regards to the Itemized Bid schedule of values : Under Roadway Improvements STA 129+00 to STA <br /> 219+40 (0545B) (page 00310-9) <br /> Bid Item > 455433-3 "Sheet Piling Steel- F& I Permanent" 7,304/SF <br /> Bid Item > 460-704 "Aluminum Pedestrian Bullet Barrier Railing" 332/LF <br /> These two items seem to be duplicated under the Proposed Bridges & Retaining Wall ( 26th Street <br /> Retaining/Barrier Wall ) <br /> {Page 00310-141 <br /> Bid Item > 455433-3 "Sheet Piling Steel- F& I Permanent" 7,304/SF <br /> Bid Item > 460-704 "Aluminum Pedestrian Bullet Barrier Railing" 332/LF. <br /> Can you please clarify? <br /> ANSWER NO. 4 <br /> Yes it appears the Pay Items listed above were inadvertently duplicated in the Roadway Portion as <br /> well . In addition to the two items listed above the following two items are also a duplication . <br /> 05215 4 FDOT index 423 Barrier Wall 332 LF; 05216 3 FDOT Index 6120 Coping/Sidewalk 332 LF. <br /> The Itemized Bid Schedule has been revised to delete the duplicated items. <br /> QUESTION NO. 5 <br /> During the meeting IRC indicated that alltesting would be done by the owner, "IRC" . Does this include <br /> the PDA during pile driving operations,, and any vibration monitoring? Also, to eliminate the bid item <br /> " Pile Dynamic Load Testing 1- LS. Please clarify. <br /> ANSWER NO. 5 <br /> The PDA testing during the pile driving operation will be conducted by the OWNERS Consultant. <br /> Although the PDA testing will not be the CONTRACTORS responsibility he/she will be required for any <br /> vibration monitoring. The Itemized Bid Schedule has been revised to delete the Pay Item 455- 137 <br /> "Pile Dynamic Load Testing"- 1 LS on the 33rdy37 th , 45th and 49th Street bridges. <br /> QUESTION NO. 6 <br /> Being that this project is federally funded by the State — is there any wage rates required ? <br /> ANSWER NO. 6 <br /> No wage requirements on the subject project . A portion of the project is funded by the Florida <br /> Department of Transportation . <br /> QUESTION NO. 7 <br /> Has an asbestos survey been performed on the houses identified to be demolished or we will . have to <br /> perform the survey and add the costs to our proposal ? <br /> Page 3 of 6 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St ( Arcadis)\Admim\Bid Documents\Addendum # 1 \Addendum No. 1 <br /> 11 -942.doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.