My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:05:06 PM
Creation date
10/1/2015 5:05:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227C.1
Agenda Item Number
12.I.2
Entity Name
Dickerson, Florida Inc.
Subject
Addendum No.1
66th Avenue Roadway Improvments
Area
SR 60 to North of 49th Street
Bid Number
2013008
Supplemental fields
SmeadsoftID
11698
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANSWER NO. 17 <br /> Stay in-place metal deck forms are more consistent with a superstructure construction associated <br /> with an AASHTO beam structure, not a cast-in-place continuous reinforced concrete flat slab <br /> structure . It is unclear on how the contractor would utilize the metal deck forms in the construction . <br /> QUESTION NO. 18 <br /> Has any consideration been given to re-design of the 41st St. bridge to pre-stressed/post-tensioned as <br /> the other bridges? <br /> ANSWER NO . 18 <br /> No . <br /> QUESTION NO. 19 <br /> Pay Item 630443A — Plan note on sheet T4 states "Includes cost of installing conduit called in plans <br /> as 63041 22 and that run alongside this conduit" . Question : Are the conduits noted in the Bid <br /> Schedule as 63041 22 to be included in the cost of 630443A or priced separately as shown in the Bid <br /> Schedule ? Or is this 4" conduit to be a sleeve for the 63041 22 conduits ? If so, 2-2" PVC conduits will <br /> not fit in the 4" . Please verify the intent and installation scope of items 63041 22 and 630443A . <br /> ANSWER NO. 19 <br /> The intent of the footnote is that the payment for the directional bore is adequate to install all <br /> conduits called out under pay item 630443A and 63041 22, and one 2" conduit be included in item <br /> 630443 . Payment for the additional 4" and/or 2" conduits included in the directional bore run will be <br /> made under item 63041 22. Separate payment for additional directional bores are not included under <br /> item 63041 22 . The 4" conduit is not intended to be a sleeve for the 2" conduits . <br /> QUESTION NO . 20 <br /> Items 659401 and 659418 (3 & 5 Section Back. Plates ) are included in Bid Schedule (05458) for the <br /> intersection at 66th Ave . & 26th Street but not included in the Bid Schedules (A, C, and remainder of B ) . <br /> They are also not included at all in the Tabulation of Quantities, but are noted to be installed on ALL <br /> 650- 1-XXX signals on ( East-West) approaches . MOT requires them on ALL signals and are also <br /> required to have reflective borders . Please clarify. <br /> ANSWER NO. 20 <br /> Backplates with reflective borders are required for all signals . <br /> QUESTION NO. 21 <br /> Bid Schedule for (0545B ) has a signalization item section for 26th St. and also a section for 41st St. The <br /> plans indicate this intersection to be 45th St . Is this a typo ? Please clarify. <br /> ANSWER NO* 21 <br /> No it is not a typo . We are proposing signals at 41st and 45th Street intersections . The 41st Street <br /> signal plans are a part of the Kimley- Horn plan set, which is labeled as the "66th Ave & 41st <br /> Intersection Plans Sta 219+40 to 245+90 .pdf" plans on the CD . <br /> Page 5 ,of 14 <br /> F:Tub is WorWENGINEERING DIVISION PRO.IECTS\0545-66Th Ave SR60 to 57th St (Arcadis)\Adtnim\Bid Docunen&\Addendum #'\Addendum No. 2 <br /> 11 - 19-12 .doc <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.