My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:05:06 PM
Creation date
10/1/2015 5:05:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227C.1
Agenda Item Number
12.I.2
Entity Name
Dickerson, Florida Inc.
Subject
Addendum No.1
66th Avenue Roadway Improvments
Area
SR 60 to North of 49th Street
Bid Number
2013008
Supplemental fields
SmeadsoftID
11698
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q <br /> QUESTION NO. 22 <br /> Pay item quantities in Bid Schedule do not coincide with quantities in Tabulation of Quantities. As <br /> always, we should bid the quantities depicted in the Bid Schedule, correct? Please clarify. <br /> ANSWER NO. 22 <br /> The bid submitted should reflect the quantities listed in the Itemized Bid Schedule . <br /> QUESTION NO. 23 <br /> There are valves called out on the pians to be adjusted or raised . Please clarify as to how these are to <br /> be paid for. <br /> ANSWER NO. 23 <br /> A pay item has been added for the valve adjustment. <br /> QUESTION NO. 24, <br /> On the 66th Ave plans by Arcadis, the .pay item footnotes on sheet 33, #04254322 "includes furnishing <br /> & installing curb inlet baskets by Suntree Technologies or equal ." Is this to be part of all of the curb <br /> inlets as the number does not correspond to any of the 0425 series items . ( Kimley- Horn plans do not <br /> indicate the installation of the curb inlet baskets unless we are mistaken ) . <br /> ANSWER NO . 24 <br /> Curb .inlet baskets are required at structure S- 206 and S-212 only. <br /> QUESTION NO. 25 <br /> On the bid form Item No. 430475480 is 80" RCP Is this correct? Should this be 84" RCP ? ( Kimley- <br /> Hormplans ) <br /> ANSWER NO. 25 <br /> The Itemized Bid Schedule Pay Item No . 430475480 has been revised to reflect the size change to an <br /> 84" RCP . The Pay Item No also has been revised to 430475484. <br /> QUESTION NO. 26 <br /> Is there any information available for thickness of asphalt on the existing roadway? <br /> ANSWER NO. 26 <br /> Indian River County has not performed any coring samples on the existing asphalt. Therefore, we do <br /> not have any information available on the thickness of the existing asphalt roadway. <br /> QUESTION NO. 27 <br /> Is the quantity of subsoil excavation shown on cross section plans included in the Regular excavation <br /> items ? <br /> ANSWER NO. 27 <br /> The subsoil excavation shown on the cross sections between station 128+00 and 163+00 is included in <br /> the regular excavation quantities . <br /> Page 6 of 14 <br /> FAPublic WorksIENGMER]NG DIVISION PROJECt'St0545-66711 Ave SR60 to 57th St (Arcadis)\Admim\Bid Documen&% Addenduni #2\Addendum No. 2 <br /> 1 l - ] 9- 12.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.