QUESTION NO. 28 <br /> At what intervals do we need to test for the permeability of the mixed soils shown on sheets 26 and <br /> 27 ? <br /> ANSWER NO. 28 <br /> Permeability tests shall be taken at intervals not to exceed 500 feet in length . A minimum of two <br /> permeability tests will be required for each individual Swale segment or dry detention area . <br /> QUESTION NO. 29 <br /> On page 47 " Open cut repair detail " states Base replacement shall be limerock only. Is Coquina base <br /> acceptable? <br /> ANSWER NO. 29 <br /> Yes . <br /> QUESTION NO. 30 <br /> Per addendum 1 the quantity for bid item 120-6 has not changed from original bid items to reflect <br /> answer to question # 8 ? <br /> ANSWER NO. 30 <br /> The Embankment quantity ( Pay Item 120-6 ) is independent to the channel excavation quantity ( Pay <br /> 120-5 ) . <br /> QUESTION NO. 31 <br /> There are 2 items for Turn out Construction . Is one for concrete Turn out construction and for <br /> asphalt? Or the item that says asphalt is for the asphalt pavement portion of the Turn outs ? <br /> ANSWER NO. 31 <br /> No . They are both for asphalt turnout construction . This was addressed in the Pre- Bid meeting <br /> minutes question no . 10 . The 286- 1 Pay Item refers to total construction and 286- 2 refers to placing <br /> asphalt on existing asphalt driveways. Please refer to Pay Item Footnotes on revised sheet 33 which <br /> was apart of Addendum No . 1 . <br /> QUESTION NO* 32 <br /> The units for Asphalt Turn out Construction is Tons in 2 bid items and is SY in another bid item, please <br /> clarify? <br /> ANSWER NO* 32 <br /> The differences in the units are addressed in the Pay Item Footnotes on sheet 33 . The 2864 Pay Item <br /> refers to total construction and 286- 2 refers to placing asphalt on existing asphalt driveways . Please <br /> refer to Pay Item Footnotes on revised sheet 33 which was apart of Addendum No . 1 . <br /> QUESTION NO* 33 <br /> Do you have any information on the depth and the size of the well which needs to be plugged ? <br /> Page 7 of 14 <br /> F:Tublic Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis} Admim\Bid DocumentskAddendunl #2\Addendum No. 2 <br /> 11 - 19wl ldoc <br />