My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:05:06 PM
Creation date
10/1/2015 5:05:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227C.1
Agenda Item Number
12.I.2
Entity Name
Dickerson, Florida Inc.
Subject
Addendum No.1
66th Avenue Roadway Improvments
Area
SR 60 to North of 49th Street
Bid Number
2013008
Supplemental fields
SmeadsoftID
11698
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NO. 28 <br /> At what intervals do we need to test for the permeability of the mixed soils shown on sheets 26 and <br /> 27 ? <br /> ANSWER NO. 28 <br /> Permeability tests shall be taken at intervals not to exceed 500 feet in length . A minimum of two <br /> permeability tests will be required for each individual Swale segment or dry detention area . <br /> QUESTION NO. 29 <br /> On page 47 " Open cut repair detail " states Base replacement shall be limerock only. Is Coquina base <br /> acceptable? <br /> ANSWER NO. 29 <br /> Yes . <br /> QUESTION NO. 30 <br /> Per addendum 1 the quantity for bid item 120-6 has not changed from original bid items to reflect <br /> answer to question # 8 ? <br /> ANSWER NO. 30 <br /> The Embankment quantity ( Pay Item 120-6 ) is independent to the channel excavation quantity ( Pay <br /> 120-5 ) . <br /> QUESTION NO. 31 <br /> There are 2 items for Turn out Construction . Is one for concrete Turn out construction and for <br /> asphalt? Or the item that says asphalt is for the asphalt pavement portion of the Turn outs ? <br /> ANSWER NO. 31 <br /> No . They are both for asphalt turnout construction . This was addressed in the Pre- Bid meeting <br /> minutes question no . 10 . The 286- 1 Pay Item refers to total construction and 286- 2 refers to placing <br /> asphalt on existing asphalt driveways. Please refer to Pay Item Footnotes on revised sheet 33 which <br /> was apart of Addendum No . 1 . <br /> QUESTION NO* 32 <br /> The units for Asphalt Turn out Construction is Tons in 2 bid items and is SY in another bid item, please <br /> clarify? <br /> ANSWER NO* 32 <br /> The differences in the units are addressed in the Pay Item Footnotes on sheet 33 . The 2864 Pay Item <br /> refers to total construction and 286- 2 refers to placing asphalt on existing asphalt driveways . Please <br /> refer to Pay Item Footnotes on revised sheet 33 which was apart of Addendum No . 1 . <br /> QUESTION NO* 33 <br /> Do you have any information on the depth and the size of the well which needs to be plugged ? <br /> Page 7 of 14 <br /> F:Tublic Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis} Admim\Bid DocumentskAddendunl #2\Addendum No. 2 <br /> 11 - 19wl ldoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.