Laserfiche WebLink
QUESTION NO . 39 <br /> On the KHA plans, sheet 15, note #2 indicates lateral "A" canal bottom being re-graded through a <br /> transition of 50' up and downstream of bridge structure to the existing canal section . Where is •the re- <br /> grading to be paid ? Under the bridge rubble rip- rap ? Or the regular excavation ? This note only <br /> appears on the KHA plans ( & not Arcadis) ? <br /> ANSWER NO. 39 <br /> The cost associated with the excavation to install the rubble rip-rap and the associated canal bottom <br /> transitions are to be included within pay item 531-34, as per FDOT Specification Section 530. <br /> QUESTION NO . 40 <br /> The channel excavation ( lake excavation ) volume (44,438 cy- item 120-5 ) on the bid schedule sheet <br /> 00310-23 appears excessive to the volumes we have quantified ( over 30%) . Please advise . <br /> ANSWER NO. 40 <br /> The quantity has been revised to be 38,000 CY: <br /> QUESTION NO. 41 <br /> Is it possible to e-mail the addendum on Monday afternoon in addition to fed-ex as people will be <br /> leaving for the holiday and the extra hours available ( if e- mailed ) will help . <br /> ANSWER NO. 41 <br /> Indian River County will not email Addendum No . 2 . Addendum No . 2 will be fed-ex and posted on <br /> Demand Star. Therefore, all plan holders will have access to the Addendum on Demand Star. <br /> QUESTION NO. 42 <br /> Please clarify the Class I concrete item for S409A. On the Summary of Drainage Structures there is <br /> 4. 53 c.y. of Class I concrete what is this for? Please clarify. <br /> ANSWER NO. 42 <br /> The 4. 53 Cy of Class I concrete is for endwall number EW 250 in detention area number 6 . <br /> QUESTION NO. 43 <br /> On the Summary of Drainage Structures a concrete collar is shown for S-206A. The plans reflect 102 If. <br /> of 30" CAP being constructed from S-206A to the lake . Where is the collar to be constructed ? Please <br /> clarify. <br /> ANSWER NO. 43 <br /> A concrete collar is not required at this location . <br /> QUESTION NO. 44 <br /> There is a 72" RCP shown on page 63 of 275 . However there is not a pay item on the bid schedule. <br /> Please clarify. <br /> Page 9 of 14 <br /> F:\Public WorksENGINEERING DIVISION PROJECTS\0545-667h Ave SR60 to 57th St (Amadis)\Admhn\Bid Documents!_Addendum QhAddendum No. 2 <br /> 114 942 .doc <br />