Laserfiche WebLink
ANSWER NO. 44 <br /> The Itemized Bid Schedule has been revised to add a Pay Item No. 430475472 to include the 72" <br /> RCP . <br /> QUESTION NO* 45 <br /> In Addendum # 1 on the summary of quantities for project No . 0545B pay item 633421-3 shows <br /> 10, 383 ft of96 strand fiber. In Addendum# 1 on the summary of quantities for project No . 0545C pay <br /> item 633421-3 shows 6, 104 ft of96 strand fiber.The total of these two quantities equals 16,487 feet <br /> but on the tabulation of quantities the total for the 96 strand fiber under pay item 633421-3 is <br /> 14, 237 feet. Why is there a difference in the quantities ? <br /> ANSWER NO. 45 <br /> The additional quantity reflected on the Itemized Bid Schedule is to include the service slack at every <br /> slack/splice box. <br /> QUESTION NO. 46 <br /> On the Interconnect Plans sheet T44 the 96 strand fiber pay item 633421-3 seems to stop . at a pull <br /> box located at approximately 219+50. Is the 96 strand fiber to be coiled at this location or does it <br /> need to be terminated or fusion spliced to another fiber optic cable? <br /> ANSWER NO . 46 <br /> The 96 strand fiber needs to continue north from approximately station 219+40 to 245 +90. Although <br /> the plans do not show the fiber continued in this area the Itemized Bid Schedule under section 41" <br /> Street Intersection Sta 219+40 to 245+90 was revised in Addendum No . 1 to include the quantity <br /> under Pay Item No . 633421-3 . <br /> QUESTION NO. 47 <br /> On the Interconnect Plans sheet T45 the 96 strand fiber pay item 633421-3 seems to begin at a pull <br /> box located at approximately 246+00. Is the 96 strand fiber to be coiled at this location or does it <br /> need to be terminated or fusion spliced to another fiber optic cable? <br /> ANSWER NOo 47 <br /> Please refer to answer No .46 above. <br /> QUESTION NO. 48 <br /> On pages 61, 62, 71, 80 & 84 reference is made to deflections of the 12" RWM and 12" W. M . . These <br /> deflections include fittings , 12" double line stops , restraining existing pipe and deflections to be <br /> constructed on the existing 12" RWM & 12" W. M . Please clarify how and where will the costs of these <br /> deflections and line stops be applied to on the bid form . <br /> ANSWER NO. 48 <br /> Refer to the utility plans for this project. The cost of all fittings, joint restraints, and deflections is to be <br /> included in the cost of the water main pipe . An item has been added for the line stops . <br /> QUESTION NO* 49 <br /> Are all the light poles and electrical poles to be removed by others? Some of the poles to be removed <br /> do not say by others they just say to remove light pole. <br /> Page 10 of 14 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0545.66ni Ave SR60 to 57th St (Atradis)\Admitn\Bid Documents\Addendunh #2\Addendum No. 2 <br /> - - II4942.doc <br />