My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:05:06 PM
Creation date
10/1/2015 5:05:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227C.1
Agenda Item Number
12.I.2
Entity Name
Dickerson, Florida Inc.
Subject
Addendum No.1
66th Avenue Roadway Improvments
Area
SR 60 to North of 49th Street
Bid Number
2013008
Supplemental fields
SmeadsoftID
11698
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANSWER NO. 44 <br /> The Itemized Bid Schedule has been revised to add a Pay Item No. 430475472 to include the 72" <br /> RCP . <br /> QUESTION NO* 45 <br /> In Addendum # 1 on the summary of quantities for project No . 0545B pay item 633421-3 shows <br /> 10, 383 ft of96 strand fiber. In Addendum# 1 on the summary of quantities for project No . 0545C pay <br /> item 633421-3 shows 6, 104 ft of96 strand fiber.The total of these two quantities equals 16,487 feet <br /> but on the tabulation of quantities the total for the 96 strand fiber under pay item 633421-3 is <br /> 14, 237 feet. Why is there a difference in the quantities ? <br /> ANSWER NO. 45 <br /> The additional quantity reflected on the Itemized Bid Schedule is to include the service slack at every <br /> slack/splice box. <br /> QUESTION NO. 46 <br /> On the Interconnect Plans sheet T44 the 96 strand fiber pay item 633421-3 seems to stop . at a pull <br /> box located at approximately 219+50. Is the 96 strand fiber to be coiled at this location or does it <br /> need to be terminated or fusion spliced to another fiber optic cable? <br /> ANSWER NO . 46 <br /> The 96 strand fiber needs to continue north from approximately station 219+40 to 245 +90. Although <br /> the plans do not show the fiber continued in this area the Itemized Bid Schedule under section 41" <br /> Street Intersection Sta 219+40 to 245+90 was revised in Addendum No . 1 to include the quantity <br /> under Pay Item No . 633421-3 . <br /> QUESTION NO. 47 <br /> On the Interconnect Plans sheet T45 the 96 strand fiber pay item 633421-3 seems to begin at a pull <br /> box located at approximately 246+00. Is the 96 strand fiber to be coiled at this location or does it <br /> need to be terminated or fusion spliced to another fiber optic cable? <br /> ANSWER NOo 47 <br /> Please refer to answer No .46 above. <br /> QUESTION NO. 48 <br /> On pages 61, 62, 71, 80 & 84 reference is made to deflections of the 12" RWM and 12" W. M . . These <br /> deflections include fittings , 12" double line stops , restraining existing pipe and deflections to be <br /> constructed on the existing 12" RWM & 12" W. M . Please clarify how and where will the costs of these <br /> deflections and line stops be applied to on the bid form . <br /> ANSWER NO. 48 <br /> Refer to the utility plans for this project. The cost of all fittings, joint restraints, and deflections is to be <br /> included in the cost of the water main pipe . An item has been added for the line stops . <br /> QUESTION NO* 49 <br /> Are all the light poles and electrical poles to be removed by others? Some of the poles to be removed <br /> do not say by others they just say to remove light pole. <br /> Page 10 of 14 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0545.66ni Ave SR60 to 57th St (Atradis)\Admitn\Bid Documents\Addendunh #2\Addendum No. 2 <br /> - - II4942.doc <br />