Laserfiche WebLink
QUESTION NO. 58 <br /> In reference to page 00456-2- Qualifications Questionnaire, item 11, it states to attach a "notarized <br /> financial statement and other information that documents the firm ' s' financial strength and history" . <br /> What exactly is the County requesting since we are FDOT qualified and have more than adequate <br /> bonding capacity? As a privately held company, financial statement are confidential . <br /> ANSWER NO. 58 <br /> If the CONTRACTOR submitting a bid is pre qualified with the Florida Department of Transportation <br /> ( FDOT) then in lieu of a notarized financial statement Indian River County will accept FDOT pre <br /> qualification . <br /> QUESTION NO. 59 <br /> Addendum # 1 Sheet T4 note #29 says that data conversion will be accomplished with an Ethernet <br /> switch . Who is providing and installing the Ethernet switch ? if it is the fiber optic cable installer please <br /> include the manufacturer and part number for the Ethernet switch . <br /> ANSWER NO. 59 <br /> It will be the contractor' s responsibility to furnish and install the Ethernet switch and to coordinate <br /> this work with the various subcontractors. <br /> QUESTION N0. 60 <br /> Addendum # 1 Sheet T4 note #30 says that the fiber optic cable shall be furnished and installed with a <br /> trace wire in each conduit run . What size or AWG trace wire is required for this? <br /> ANSWER NO* 60 <br /> The trace wire shall be a continuous # 10 stranded copper trace wire . <br /> QUESTION NO. 61 <br /> What type fiber optic pigtails should be spliced onto the 12 strand fiber to the signal cabinets ? <br /> ANSWER NO. 61 <br /> The main trunk line for the ITS cable shall be 96 strand . At each cabinet the main line . will be <br /> connected to the 12 strand fiber optic line . <br /> QUESTION NO. 62 <br /> On the Arcadis plans, sheet 48 of 275, pavement restoration is necessary for the gravity wall and <br /> drainage in the vicinity. Where are the restoration costs to be included ? <br /> ANSWER NO. 62 <br /> Pavement restoration shall be included in the cost of the gravity wall . <br /> QUESTION NO. 63 <br /> In the same location , there is an area of overlay in the parking lot that is to occur. Where are those <br /> costs to be attributed ? What depths of overlay are expected ? <br /> Page 13 of 14 <br /> F'sPublic WorWE NI GMEERING DIVISION PROJECTS10545.66Th Ave SR60 to 57th St (Anadis)1Admim\Bid DocumentE Addendum #21Addendum No. 2 <br /> I I -19- 12.doc <br />