My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-120B
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-120B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 11:39:11 AM
Creation date
10/1/2015 2:13:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Developer's Agreement
Approved Date
05/11/2010
Control Number
2010-120B
Agenda Item Number
10.A.1.
Entity Name
DiVosta Homes
Subject
Waterway Village Amended Settlement Agreement
Reference Resolution No. 2010-121
Supplemental fields
SmeadsoftID
9683
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e . <br /> l <br /> RESOLUTION 24W2010 - <br /> included in the Preserve Area Management, Plan . ti+The - plan shall demonstrate how <br /> sufficient quantities of surface runoff frons portions of the developed areas will be <br /> conveyed to wetland- areas in order -to maintain -or improve their existing bydroperiod. <br /> 50 . All elements of the stormwater management -system shall be designed to prevent <br /> impacts to adjacent areas and - to the receiving bodies of water, including the North <br /> Relief Canal and the -Indian River Lagoon . The lakes within Waterway Village DRI <br /> shall be designed to treat the stormwater from developed parcels as well . as the <br /> stormwater from adjacent roadways, including 49th Street, 53rd Street, 43rd Avenue, <br /> 58th Avenue , 51St Court and any other roads identified as appropriate by Indian River <br /> County. The developer shall prepare plans that reasonably- demonstrate that these <br /> waterbodies and adjacent properties will not be negatively impacted by water quantity <br /> or timing of delivery . These plans shall be approved by St . Johns Water <br /> Management District and Indian- River County prior to the construction of the surface <br /> water management system. <br /> 5 .1 . The developer shall . coordinate with - the IRFWCD ° -and SJRWMD to - identify the <br /> preferred l4e#- ei locations to discharge storm water from the project site . The <br /> developer shall not relocate the existing control structure located just east of 58th <br /> Avenue in the North Relief Canal: <br /> 52 . During the site plan and preliminary PD plan review process , the ct_ �+� � develoner <br /> and Indian River County shall work together to minimize the amount of impervious <br /> surface .constructed for the purposes of automobile . parking on the Waterway <br /> Tr11cVilla �e site . The developer and the County shall consider the use of pervious <br /> parking lot materials where feasible . <br /> 53 . Landscape management shall be addressed within the Preserve Area Management <br /> Plan prior to applying for an Environmental Resources Permit and installing <br /> landscape material on the project site . The Preserve Area Management Plan shall <br /> provide detail. concerning the application . of fertilizers , herbicides and - pesticides - in <br /> landscaped areas . 4ieThe .plan shall include methods for minimizing theimpact of <br /> chemical runoff associated with - lawn and ' ` landscape maintenance . The <br /> Pevc)-&pei:developer shall coordinate with = the St. Johns River Water Management <br /> District to formulate - - and implement BMPs to reduce the use of pesticides . and <br /> fertilizers throughout the project." <br /> 54 . : A vegetated littoral zone shall be established in the lakes constructed on site . _ The _ <br /> littoral zone shall be constructed to provide a minimum of 40 SF of littoral area for <br /> every linear foot . of lakeshore not- adjacent to- residential- units . Prior to - the expansion <br /> of the existing lake . -system, the developer shall prepare a design and management <br /> plan for the wetland/littoral zone -that will- be developed ,as part of that system . The <br /> plan may be incorporated into the - Preserve Areca- Management Plan . arid. .. shall be <br /> subject to approval by the - .St. jtJohns River Water Management_ District; " and <br /> Indian Riverprior to beginning any excavation activity . Littoral zones <br /> RM : 7375429 : 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.