Laserfiche WebLink
RESOLUTION ' -0-92010 - <br /> shall be constructed concurrent with lake excavation and final grading, and shall <br /> contain wetland trees (Cypress , Maple, Sweetgum, etc . ) . A minimum of 1 tree per <br /> 10 ' of shoreline is required. *tThe trees tree may be grouped and must be a <br /> minimum of 5 ' tall with a 1 " caliper. Operational permits for the surface water <br /> management system shall not be issued nor shall a certificate of occupancy for any <br /> portion of the project be issued until such time as . littoral zones have been found to be <br /> constructed in conformance with approved plans . Littoral zones must be approved <br /> prior to the issuance. of a site plan or land development permit for each phase . <br /> 55 . Maintenance and management efforts required to a-s-&��i:& assure the continued <br /> viability of preserved wetland habitats and the proper operation of all components of <br /> the surface water management system shall be the financial and physical , <br /> responsibility of the developer. Any entities subsequently approved by Indian River <br /> County to. replace the -developer shall be required, at a minimum, to assume the <br /> responsibilities outlined above . <br /> 56 . A minimum of 50% of the landscape material shall be native drought-tolerant <br /> species . This requirement shall be reflected in all landscape plans submitted for <br /> review and approval . <br /> Water Supply <br /> 57 . No building permits shall be issued, site plans released, or land development permits <br /> issued for any phase of the Waterway Jv;+' P-E�eVilldevelopment until the developer <br /> has provided written confirmation €t Ffrom the St . Johns River Water Management <br /> District that they have coordinated the abandonment of free-flowing Floridian aquifer <br /> wells on site and completed the abandonment process . <br /> 58 . No building permits shall be issued, site plans released, or land development permits <br /> issued for any phase -of the. Waterway vi-llageVi=Ha e development until the developer <br /> has provided written confirmation =€e}from the St. Johns River Water Management <br /> District and Indian - River County Department of Utility Services that adequate <br /> capacity of treated potable water and service/distribution infrastructure will exist by <br /> development of. the phase . The developer shall enter into . an agreement with Indian <br /> River County - to construct- a 12 " diameter master planned water main and 12 " <br /> diameter master planned force main along 53rd Street . from 58t" Avenue to the eastern <br /> property line of the project site . <br /> 59 . The preferred source of irrigation water shall be treated wastewater effluent at such <br /> - tinge as this - source is . made available at the site . Should treated wastewater be <br /> unavailable or a . supplemental source of irrigation .. be needed, existing or created <br /> surface water (i . e . lakes or- canals) shall be used to the maximum extent available . <br /> Project site plans , , preliminary - PD plans , and land development permit plans shall <br /> Show that the project 's irrigation systems.. will be designed and installed in a manner <br /> that will allow. utilization of reuse water. Irrigation systems shall be connected to <br /> RM: 7375429: 1 <br /> i <br />