My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-073
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 12:04:40 PM
Creation date
10/1/2015 5:14:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/09/2013
Control Number
2013-073
Agenda Item Number
12.I.1
Entity Name
Ecological Associates, Inc.
Subject
Sector 3 Dune Restoration Project Phase 1 Phase 2, and Phase 3
2013 Post Construction Biological Monitoring
Work Order No. 1
Area
Sector 3
Project Number
13-339
Supplemental fields
SmeadsoftID
11853
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Sector 3 Beach and Dune Restoration Project Page 6 <br /> Exhibit A — 2013 Scope of Work <br /> d) In-water Sea Turtle Monitoring : Data collected during in-water monitoring <br /> will be tabulated and transmitted to the County at the conclusion of each <br /> quarterly survey effort. At the conclusion of each year (four quarters) of <br /> surveying, data will be analyzed and marine turtle abundance will be <br /> compared between the pre-construction baseline and the current year' s data for <br /> each individual transect and for the sites as a whole (all transects combined) <br /> for both the Treatment and Control sites . Data for green and loggerhead turtles <br /> will be analyzed and presented separately. This annual report will present <br /> methods, results and conclusions of the monitoring effort. <br /> e) Hardbottom Monitoring : Following completion of the field survey effort CSA <br /> will analyze the transect and quadrat data per FDEP Biological Monitoring <br /> Plan requirements and prepare a draft summary report. Data deliverables, <br /> including all digital video transects and frame-grabbed images from all <br /> transects, PointCount files and associated data, Excel spreadsheets of <br /> PointCount data, Excel spreadsheets of in situ quadrat data, and GIS <br /> shapefiles of habitat maps developed from ground truthing and interpretation <br /> of aerial imagery will be delivered to FDEP on CD or portable hard drive . <br /> The draft summary report will include appropriate graphics/tables, statistical <br /> analyses of the collected data, comparisons to previous years ' survey data, and <br /> an assessment of project-related impacts, if any, to hardbottom communities . <br /> A separate UMAM report will be provided to include a comparison with <br /> statistical analyses of the pre= and post-construction hardbottom exposure <br /> including net loss/gain of hardbottom , sand volume and distribution changes, <br /> and an assessment of hardbottom impacts attributable to the Project, natural <br /> processes, and other effects including recent "treasure-salvage" operations, as <br /> observed on monitoring transects or along the landward edge of hardbottom . <br /> The draft summary and UMAM reports will be provided to the County for <br /> distribution to a 3rd party for impartial review and comment. CSA and EAI <br /> will then meet with the County and 3 `d party reviewer to identify and discuss <br /> any needed changes to the draft summary and UMAM reports . After such <br /> changes are made by CSA, EAI will forward the summary report to FDEP in <br /> partial fulfillment of permit conditions. <br /> All reports will be submitted to the County in accordance with Exhibit C . <br />
The URL can be used to link to this page
Your browser does not support the video tag.