My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:23:01 PM
Creation date
10/1/2015 4:09:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021B
Agenda Item Number
8.E.
Entity Name
Mancil Tractor Services
Subject
Contract Documents and Specifications Overflow and Vehicular Staging
Fairgrounds Events
Area
Indian River Fairgrounds Phase 2
Project Number
1047-2
Bid Number
2012028
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10979
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION NO , 104 EROSION CONTROL AND TREATMENT OF DEWATERING <br /> WATER AND STORMWATER FROM THE CONSTRUCTION SITE <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area . The pollution control <br /> measures shall prevent turbid or otherwise polluted waters from being discharged from <br /> the construction site or work area , to undeveloped portions of the site or off- site . <br /> B . The OWNER considers pollution from dewatering water and stormwater runoff from a <br /> construction site or work area to be a very serious offense . The CONTRACTOR is <br /> solely responsible for preventing pollution caused by dewatering water and stormwater <br /> runoff from the construction site or work area . <br /> C . The pollution control measures specified herein represent minimum standards to be <br /> adhered to by the CONTRACTOR throughout the Project ' s construction . The OWNER <br /> reserves the right to require the CONTRACTOR to employ additional pollution control <br /> measures , when in the sole opinion of the OWNER , they are warranted . If site specific <br /> conditions require additional erosion and stormwater pollution control measures during <br /> any phase of construction or operation to prevent erosion or to control sediment or other <br /> pollution , beyond those specified in the Drawings or herein , implement additional best <br /> management practices as necessary , in accordance with Chapter 4 , " Best Management <br /> Practices for Erosion and Sedimentation Control " of the Florida Erosion and Sediment <br /> Control Inspector' s Manual , and other references as may be required by regulatory <br /> permits . ( http : //www . dep . state . fl . us . /water/ nonpoint/docs/erosion /erosion - inspectors - <br /> manual . pdo <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br /> Section . Alternatively , the OWNER may halt the CONTRACTOR ' s operations until the <br /> CONTRACTOR is in full compliance with this Section . If the OWNER halts the <br /> CONTRACTOR ' s work as a result of its failure to comply with this Section , the <br /> Construction Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter4 - " Best Management Practices <br /> for Erosion and Sedimentation Control " and Chapter 5 — " Best Management Practices <br /> for Dewatering " of the Florida Erosion and Sediment Control Inspector' s Manual . In the <br /> event of a conflict between the referenced Chapters and these Specifications , the more <br /> stringent requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph SC - 6 . 08 of the Supplementary Conditions . Per paragraph SC - 6 . 08 . 0 of <br /> the Supplementary Conditions , the CONTRACTOR shall apply for , obtain , and pay <br /> 01025 -2 <br /> Technical Specifications <br /> F : \PublicWorks\ENGINEERING DIVISION PROJECTS \1047-2 IRC Fairgrounds Overflow & Vehicular Staging Phase 2\Admim \bid <br /> documents\Technical Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.