My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:23:01 PM
Creation date
10/1/2015 4:09:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021B
Agenda Item Number
8.E.
Entity Name
Mancil Tractor Services
Subject
Contract Documents and Specifications Overflow and Vehicular Staging
Fairgrounds Events
Area
Indian River Fairgrounds Phase 2
Project Number
1047-2
Bid Number
2012028
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10979
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for all other required permits , licenses , sampling , and tests . Permits the <br /> CONTRACTOR may need to secure may include but not be limited to : <br /> 1 . Long -term and /or short-term dewatering permit as required by the St . Johns <br /> River Water Management District ( SJRWMD ) . Generally , only the short-term <br /> permit is required . Contact SJRWMD at ( 321 ) 984 -4940 to determine which <br /> permit is required and the associated statutory requirements ; <br /> 2 . SJRWMD RDS - 50 Permit ( required ) , <br /> 3 . The State of Florida Generic Permit for Stormwater Discharge From Large <br /> and Small Construction Activities ( required ) . Contact the Florida <br /> Department of Environmental Protection ( FDEP ) at ( 866 ) 336 -6312 (toll <br /> free) or ( 850 ) 245 -7522 or www , dep . state . fl , us/water/stormwater/npdes/ <br /> 4 . FDEP ' s Uncontaminated Groundwater Release Permit ( required if <br /> dewatering occurs) . This permit requires water quality testing by a State <br /> certified laboratory . <br /> B . Provide copies of all permits to the OWNER and ENGINEER and comply with all <br /> conditions contained in all permits at no extra cost to the OWNER . If there is a conflict <br /> between any permit requirement and these Specifications , the more stringent <br /> specification or requirement shall govern . <br /> C . In addition to paying for all permit fees , CONTRACTOR shall also pay for all water <br /> quality sampling and laboratory tests required by any permit . <br /> 1 . 3 GENERAL <br /> A . Do not begin any other construction work until the pollution control and <br /> treatment system has been constructed in accordance with approved plans and <br /> permits and approved for use by the OWNER and applicable permitting <br /> authorities . <br /> B . From time to time , the OWNER or ENGINEER will inspect the pollution control and <br /> treatment system and may take effluent samples for analysis by a testing laboratory <br /> selected and paid for by the OWNER . If at any time , the OWNER or ENGINEER <br /> determines that the pollution control and treatment system is not in compliance with <br /> the approved system , the OWNER or ENGINEER will shut the portion of the project <br /> down that is not in compliance , and it shall remain shut-down until the pollution <br /> control and treatment system is properly constructed or repaired , and complies with <br /> the approved pollution control and treatment system plans and specifications . <br /> C . Schedule construction to minimize erosion and stormwater runoff from the <br /> construction site . Implement erosion control measures on disturbed areas as soon <br /> as practicable in portions of the site where construction activities have temporarily or <br /> permanently ceased , but in no case more than 7 days after the construction activity <br /> in that portion of the site has temporarily or permanently ceased . In addition to <br /> other temporary erosion control measures that may be implemented , application of <br /> polyacrylamide is required on all such disturbed areas within 7 days after the <br /> construction activity in that portion of the site has temporarily or permanently <br /> ceased , unless final landscaping has been installed . Polyacrylamide application <br /> shall be as specified herein . <br /> 01025 -3 <br /> Technical Specifications <br /> F : \Public Works \ENGINEERING DIVISION PROJECTS \ 1047-2 IRC Fairgrounds Overflow & Vehicular Staging Phase 2 \Admim\bid <br /> documents\Technical Specifications . doc <br />