My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:23:01 PM
Creation date
10/1/2015 4:09:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021B
Agenda Item Number
8.E.
Entity Name
Mancil Tractor Services
Subject
Contract Documents and Specifications Overflow and Vehicular Staging
Fairgrounds Events
Area
Indian River Fairgrounds Phase 2
Project Number
1047-2
Bid Number
2012028
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10979
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The numerical designations for fertilizer indicate the minimum percentages <br /> ( respectively) of ( 1 ) total nitrogen , (2 ) available phosphoric acid and ( 3 ) water- soluble <br /> potash contained in the fertilizer . <br /> The chemical designation of the fertilizer shall be 16 -4 - 8 . Fertilizer shall include iron , <br /> minor nutrients and trace elements . At least 50 percent of the nitrogen shall be derived <br /> from organic sources . At least 50 percent of the phosphoric acid shall be from normal <br /> super phosphate or an equivalent source which will provide a minimum of two units of <br /> sulfur . The amount of sulfur shall be indicated on the quantitative analysis card <br /> attached to each bag or other container. <br /> Contractor shall ensure 1 pound of nitrogen per 1 , 000 square feet . <br /> E . Water for Grassing : Contractor shall provide the water used in the sodding <br /> operations as necessary to meet the requirements of Article 570 - 5 and 2 . 34 . B . <br /> F . Preparation of Ground : The area over which the sod is to be placed shall be <br /> scarified or loosened to a depth and then raked smooth and free from debris . <br /> Where the soil is sufficiently loose and clean , the Owner , at his discretion , may <br /> authorize the elimination of ground preparation . <br /> G . Application of Fertilizer: Before applying fertilizer , the soil pH shall be brought to a <br /> range of 6 . 0 - 7 . 0 . <br /> Contractor shall apply two ( 2 ) applications . The initial shall be fertilizer and the second <br /> application shall be "weed and feed " . <br /> The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds <br /> per acre , or 10 pounds per 1 , 000 square feet , by a spreading device capable of <br /> uniformly distributing the material at the specified rate . <br /> Contractor shall apply applications as per manufacturer' s specification . All tickets from <br /> bags shall be handed over to the County Inspector . <br /> On steep slopes , where the use of a machine for spreading or mixing is not <br /> practicable , the fertilizer shall be spread by hand and raked in and thoroughly mixed <br /> with the soil to a depth of approximately 2 inches . <br /> H . Placing Sod : The sod shall be placed on the prepared surface , with edges in close <br /> contact and shall be firmly and smoothly embedded by light tamping with appropriate <br /> tools . <br /> Where sodding is used in drainage ditches , the setting of the pieces shall be staggered <br /> so as to avoid a continuous seam along the line of flow . Along the edges of such <br /> staggered areas , the offsets of individual strips shall not exceed 6 inches . In order to <br /> prevent erosion caused by vertical edges at the outer limits , the outer pieces of sod <br /> shall be tamped so as to produce a featheredge effect . <br /> Where sodding is placed abutting paved shoulder , the contractor is to ensure that the <br /> finished sod elevation is 1 % " below paved shoulder . <br /> On slopes greater than 3 : 1 , the Contractor shall prevent the sod from sliding by means <br /> of wooden pegs driven through the sod blocks into firm earth , at suitable intervals . <br /> 01025-21 Technical Specifications <br /> F :\PublicWorks\ENGINEERING DIVISION PROJECTS \ 1047-2 IRC Fairgrounds Overflow & Vehicular Staging Phase 2 \Admim \bid <br /> documents\Technical Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.