My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:23:01 PM
Creation date
10/1/2015 4:09:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021B
Agenda Item Number
8.E.
Entity Name
Mancil Tractor Services
Subject
Contract Documents and Specifications Overflow and Vehicular Staging
Fairgrounds Events
Area
Indian River Fairgrounds Phase 2
Project Number
1047-2
Bid Number
2012028
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10979
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sodding shall not be performed when weather and soil conditions are , in the <br /> Engineer' s opinion , unsuitable for proper results . <br /> Sod shall be placed around all structures , equipment pads , etc . <br /> I . Watering : The areas on which the sod is to be placed shall contain sufficient moisture , <br /> as determined by the Engineer , for optimum results . After being placed , the sod shall <br /> be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks . <br /> Thereafter , the Contractor shall apply water as needed until the sod roots and starts to <br /> grow for a minimum of 60 days ( or until final acceptance , whichever is latest) . <br /> J . Maintenance : The Contractor shall , at his expense , maintain the sodded areas in a <br /> satisfactory condition until final acceptance of the project . Such maintenance shall <br /> include repairing of any damaged areas and replacing areas in which the <br /> establishment of the grass stand does not appear to be developing satisfactorily . <br /> Replanting or repair necessary due to the Contractor' s negligence , carelessness or <br /> failure to provide routine maintenance shall be at the Contractor' s expense . <br /> The Contractor shall maintain the sodded area up to the final acceptance date as <br /> directed by the Engineer . Grass height shall not exceed 6 " without mowing . Clippings <br /> shall be removed from sidewalk . <br /> K . Article 575 - 5 . The first two paragraphs under this Article are deleted and the <br /> following substituted : <br /> The contract unit price for sodding shall include the costs of sod , fertilizer ( 2 <br /> applications ) , sidewalk sweeping after mowing , mowing , pegging disposal of clippings , <br /> water , tools , equipment , labor and all other incidentals necessary . <br /> L . Payment shall be made under : <br /> Item No . : 570 - 1 -2 — Performance Turf ( Bahia ) - Per Square Yard <br /> SECTION - 00575 QUEEN AND WASHINGTON PALMS <br /> The work specified in this item shall conform to FDOT Index #544 and Section 580 of the <br /> Florida Department of Transportation Standard Specifications for Road and Bridge <br /> Construction ( 2010 ) . <br /> General Tree RELOCATION specifications : <br /> 12 each " Queen Palms " <br /> 15 each "Washington Palms " <br /> Trees are currently located at the southwest corner of 41 st on 66th Ave . The trees slated <br /> for removal will be selected by county staff ahead of time . The trees are being relocated to <br /> a new park entrance west of 58th Ave on 81St St . The trees placement has been identified <br /> 01025 -22 Technical Specifications <br /> F : \Public Works \ENGINEERING DIVISION PROJECTS \ 1047-2 IRC Fairgrounds Overflow & Vehicular Staging Phase 21Admim \bid <br /> documents\Technical Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.