Laserfiche WebLink
Analytical Laboratory Methods," February 1, 2004. These procedures or methods shall <br />be approved by the DEP contract manager before use under this Contract and must be <br />cited or described in the required planning document (see Section 6). <br />h. The CONTRACTOR shall ensure that Practical Quantitation Limits (PQLs) and Method <br />Detection Limits (MDLs) required by the Contract are listed in the planning document <br />(see Section 6). <br />i. The CONTRACTOR shall ensure that the selected laboratory test methods listed in the <br />planning document can provide results that meet the Contract data quality objectives. <br />j. The CONTRACTOR shall ensure that all laboratory testing procedures follow the <br />analytical methods as approved in the planning document (see Section 6) <br />k. The CONTRACTOR shall ensure that the all laboratory quality control measures are <br />consistent with Chapter 5 of the NELAC standards. <br />I. In addition, the CONTRACTOR shall ensure that the quality control requirements <br />specified in the attached addenda are followed <br />m. The CONTRACTOR shall ensure that all sample results are calculated according to the <br />procedures specified in the analytical methods approved in the planning document. <br />3. FIELD ACTIVITIES <br />a "Sample' refers to samples that have been either collected or analyzed under the terms <br />of this Contract. <br />b. The CONTRACTOR shall ensure that all sample collection and field testing activities are <br />performed in accordance with the Department's "Standard Operating Procedures for <br />Field Activities" (DEP-SOP-001/01, February 1, 2004). The specific standard operating <br />procedures (SOPs) to be used for this Contract shall be cited in the planning document <br />(see Section 6). <br />c. Any non-standard field procedure shall be submitted for review and approval to the DEP <br />contract manager in accordance with section FA 2000 of DEP-SOP-001/01. All non- <br />standard procedures and methods must be approved by the DEP contract manager <br />before use under this Contract and must be cited or described in the planning document. <br />d. Per the quality control measures outlined in the DEP SOPs (FQ 1000 and the calibration <br />requirements of the FT -series for field testing), the CONTRACTOR shall ensure that the <br />following field quality controls (and any additional quality control measures specified in <br />the addenda) are incorporated into the project design: <br />(i) Matrix -Related Quality Controls - The CONTRACTOR shall ensure that the <br />laboratory is provided with sufficient sample volume to analyze at least one set of <br />matrix spikes and either matrix spike duplicates or laboratory duplicates as follows: <br />(1) The first time a sample from a sample collection matrix (see Table FA 1000-1) is <br />collected; <br />(2) One in each additional 20 samples of the sample collection matrix, after the first <br />20 samples; and <br />(3) The last time samples are collected for the sample collection matrix. <br />(ii) Field -generated Quality Control duplicates or replicates (not to be confused with <br />laboratory duplicates) shall be collected and analyzed at a frequency of 5% of the <br />total number of samples collected for each matrix/analyte combination (see FQ <br />1220). <br />(1) All field duplicate results greater than the contracted PQL should agree within <br />20% RPD for each measured analyte. In the event that the field duplicate <br />agreement is not observed, the CONTRACTOR shall investigate and attempt to <br />determine the cause of poor precision. The outcome of these investigations shall <br />be reported, including the corrective measures taken to minimize future <br />problems. <br />DEP Agreement No. LP###, Attachment 11, Page 2 of 12 <br />