Laserfiche WebLink
A TRUE COPY <br /> CERTIFICATION ON LAST PAGE <br /> J . K . BARTON , CLERK <br /> commencing work on the project . The DEPARTMENT ' S Public Information Office <br /> shall also be notified. <br /> (h) The AGENCY shall be responsible for assuring that any existing utilities within the <br /> project limits are not impacted . If any utilities are impacted the AGENCY shall remain <br /> responsible for obtaining all applicable permits or agreements from the utility applicable . <br /> (i) The design , construction and maintenance practices of storm drain systems shall be <br /> consistent with the standard construction and maintenance practices of the Department. <br /> Standard details for inlets , manholes , junction boxes , end treatments and other <br /> miscellaneous drainage details are provided in the Standard Index drawings . <br /> Specifications for said installation and maintenance are provided beginning in Section <br /> 430 of the 2010 and FDOT Standard Specifications for Road and Bridge Construction ; <br /> the 2010 FDOT Design Standards for Design, Construction, Maintenance and Utility <br /> Operations on the State Highway System and , Revision 1 and at the Uniform Manual of <br /> Traffic Control Devices (MUTCD) , revisions 1 and 2 dated December, 2007 . <br /> 2 . The AGENCY agrees to maintain the drainage pipe in accordance with the requirements <br /> in EXHIBIT C . It shall be the responsibility of the AGENCY to restore an unacceptable <br /> travel condition of the roadway or sidewalk caused by the pipe on Department of <br /> Transportation right- of-way within the limits of the Project. <br /> To maintain also means keeping the pipe free of debris . <br /> The AGENCY agrees to maintain as follows : a) A yearly inspection, beginning one ( 1 ) <br /> year after approval of the pipe, will be performed visually inspect the inlet and outfall <br /> structures to ensure that there is no blockage or visual damage ; b) A TV inspection will <br /> be performed every five years , beginning five ( 5 ) year after approval of the pipe, to <br /> ensure the structural stability of the pipe ; c) If there is any noticeable damage it will be <br /> the responsibility of the AGENCY to repair the structure and the roadway to operational <br /> standards . Synthetic Turf shall be maintained free of weeds and debris and must be <br /> promptly replaced if the surfacing is damaged . <br /> The above named functions to be performed by the AGENCY may be subject to periodic <br /> inspections by the DEPARTMENT at the discretion of the DEPARTMENT . Such <br /> inspection findings will be shared with the AGENCY and shall be the basis of all <br /> decisions regarding repayment, reworking , or Agreement termination . The AGENCY <br /> shall not change or deviate from said plans without written approval of the <br /> DEPARTMENT . <br /> 3 . If at any time after the AGENCY has undertaken the installation of the pipe and /or other <br /> improvements and/or maintenance responsibility mentioned above , it shall come to the <br /> attention of the DEPARTMENT ' S District Secretary that the limits or a part thereof is <br /> 3 <br />