My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-059A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-059A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:36:23 AM
Creation date
10/1/2015 6:08:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/06/2014
Control Number
2014-059A
Agenda Item Number
8.E.
Entity Name
Florida Design Drilling Corp.
Subject
Water Plant Storage Tank Interconnect Project
Area
South County RO Water Plant
Bid Number
2014031
Supplemental fields
SmeadsoftID
13322
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />SECTION 00530 - EJCDC <br />os fr&la.OIJ <br />aDILf ©SqA <br />AGREEMENT BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br />Bid No. 2014031 <br />South County RO Water Plant Storage Tank Interconnect Project <br />THIS AGREEMENT ("Agreement" or "Contract") dated /nal 6 , 20 1y <br />by and between Indian River County, a political subdivision of the State of Florida ("OWNER") and <br />Ffordt Zp Sign r -, /lens (CONTRACTOR") <br />ario <br />BACKGROUND RECITALS <br />A. Pursuant to applicable provisions of Florida law, OWNER has selected CONTRACTOR to perform <br />certain work as more specifically described in the Contract Documents as defined in Article 8 of this <br />Agreement and the term is as set forth in the Contract Documents. <br />B. CONTRACTOR agrees to perform certain work as more specifically described in the Contract <br />Documents on the terms set forth in the Contract Documents. <br />NOW THEREFORE, OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth and intending to be legally bound, agree as follows: <br />ARTICLE 1 WORK <br />1.1. CONTRACTOR as an independent contractor and not as an employee shall furnish and <br />complete all of the necessary labor, material, and equipment to perform the work as specified or <br />indicated in the Contract Documents. CONTRACTOR shall complete all workas specified or indicated <br />in the Contract Documents. The work is generally described as follows, and shall include, but is not <br />necessarily limited to the following: <br />Provide an interconnect between the South County RO (SRO) Water Treatment Facility <br />and the North County RO (NRO) Water Treatment Facility to allow the SRO storage <br />tanks to backfeed water being generated from the NRO plant during the lower <br />demanding hours. Construction will consist of the installation of approximately 212 LF <br />of 12 -inch ductile iron piping and appurtenances, (1) 12 -inch Water Specialties Flow <br />Meter, (1) Tapping Sleeve and Valve, (1) 12 -inch V -Port ball valve with electronic <br />actuator, and (1) electronic actuator on an existing 24 -inch butterfly valve. Both <br />actuators will be connected to the local SCADA system. <br />ARTICLE 2 ENGINEER <br />2.1. The project has been designed by Aaron J. Bowles, P.E. hereinafter called ENGINEER, <br />and who is to act as OWNER'S representative, assume all duties and responsibilities and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with completion <br />of the work in accordance with the Contract Documents. <br />ARTICLE 3 CONTRACT TIME <br />6. 3.1. Contract Times. Bidder agrees that the work will be completed in accordance with the <br />following timeframe. <br />00530-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.