2014-059A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-059A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:36:23 AM
Creation date
10/1/2015 6:08:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/06/2014
Control Number
2014-059A
Agenda Item Number
8.E.
Entity Name
Florida Design Drilling Corp.
Subject
Water Plant Storage Tank Interconnect Project
Area
South County RO Water Plant
Bid Number
2014031
Supplemental fields
SmeadsoftID
13322
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(a) Within 90 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />3. Perform all photographic recording and documentation of conditions prior to <br />construction. <br />4. Mobilize all labor, equipment, and materials. <br />7. Deliver and store all equipment and materials to the job site. <br />8. Notify all utilities and other affected parties prior to initiating construction. <br />(b) From 91 calendar days to 150 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Install all piping, valves, and appurtenances <br />2. Connect electronic actuator and valves to local SCADA system. <br />3. Actuator startup by manufacturer <br />4. Restore all disturbed areas to their pre -construction condition. <br />5. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs (a) and (b)) constitutes <br />Substantial Completion. <br />(c) From 151 calendar days to 180 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform contract closeout procedures. <br />Completion of all tasks outlined above (Le., Subparagraphs a, b, and c) constitute Final <br />Completion. <br />ARTICLE 4 CONTRACT PRICE <br />4.1. OWNER shall pay CONTRACTOR for completion of the work in accordance with the <br />Contract Documents in current funds in the amount of $ /1(21 749 <br />ARTICLE 5 PAYMENT PROCEDURES <br />5.1. General. CONTRACTOR shall submit Applications for Payment in accordance with <br />Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as <br />provided in the General Conditions and the Contract Documents. <br />5.2. Progress Payments. The OWNER shall make progress payments to the CONTRACTOR <br />on the basis of the approved partial payment request as recommended by ENGINEER in accordance <br />with the provisions of the Local Government Prompt Payment Act, Florida Statutes section 218.70 et. <br />seq. The OWNER shall retain ten percent (10%) of the payment amounts due to the CONTRACTOR <br />until fifty percent (50%) completion of the work. After fifty percent (50%) completion of the work is <br />attained as certified to OWNER by ENGINEER in writing OWNER shall retain five percent (5%) of the <br />payment amount due to CONTRACTOR until final completion and acceptance of all work to be <br />performed by CONTRACTOR under the Contract Documents. Pursuant to Florida Statutes section <br />218.735(8)(b), fifty percent (50%) completion means the point at which the County as OWNER has <br />00530-2 <br />