a
<br /> WR # 3481203
<br /> 7 . Before FPL can begin its engineering work on the underground electric distribution facilities, the Customer shall provide FPL with the
<br /> following :
<br /> a) Paving , grading , and drainage plans showing all surface and sub-surface drainage satisfactory to FPL,
<br /> b) A construction schedule ,
<br /> c) An estimate of when electric service will be required , and
<br /> d) Copies of the Customer's final construction plans as well as other construction drawings (plot, site , sewage , electrical , etc. )
<br /> requested by FPL
<br /> plats provided by the Customer must be either recorded by the circuit clerk or other recording officer or prepared and certified as meeting
<br /> the
<br /> requirements for recording (except approval by the governing body) by a registered land surveyor.
<br /> 8 . Prior to FPL construction pursuant to this agreement, the Customer shall :
<br /> a) Clear the FPL easement on the Customer's property of tree stumps , all trees, and other obstructions that conflict with construction ,
<br /> including
<br /> the drainage of all flooded areas . The Customer shall be responsible for clearing , compacting , boulder and large rock removal
<br />, stump
<br /> removal , paving and addressing other special conditions . The easement shall be graded to within six inches of final grade with soil stabilized
<br />.
<br /> b) Provide property line and corner stakes, designated by a licensed surveyor, to establish a reference for locating the
<br /> underground cable
<br /> trench route in the easement and additional reference points when required by FPL. Also, the Customer shall provide stakes identifying
<br /> the
<br /> location , depth , size and type facility of all non-FPL underground facilities within or near the easement where FPL distribution facilities
<br /> will be
<br /> installed . The Customer shall maintain these stakes , and if any of these stakes are lost, destroyed or moved and FPL requires their
<br /> use , the
<br /> Customer shall replace the stakes at no cost to FPL, unless the stakes are lost, destroyed or moved by an agent , employee ,
<br /> contractor or
<br /> subcontractor of FPL, in which case FPL will pay the Customer the cost of replacing the stakes .
<br /> c) It is further understood and agreed that subsequent relocation or repair of the FPL system , once installed , will be paid by the Customer
<br /> if said
<br /> relocation or repair is a result of a change in the grading by the Customer or any of the Customer's contractors or subcontractors
<br /> from the
<br /> time the underground facilities were installed ; and , that subsequent repair to FPL's system , once installed , will be paid by the Customer
<br /> if said
<br /> repair is a result of damage caused by the Customer or any of the Customer's contractors or subcontractors .
<br /> d) Provide sufficient and timely advance notice (40 days) as required by FPL, for FPL to install its underground distribution facilities
<br /> prior to the
<br /> installation of paving , landscaping , sodding , sprinkler systems , or other surface obstructions . In the absence of sufficient
<br /> coordination , as
<br /> determined by FPL, by the Customer, all additional costs for trenching and backfilling shall be paid by the Customer, and none
<br />of the costs of
<br /> restoring paving , landscaping , grass , sprinkler systems and all other surface obstructions to their original condition , should
<br /> they be installed
<br /> prior to FPL's facilities , shall be borne by FPL.
<br /> e) Pay for all additional costs incurred by FPL which may include, but are not limited to , engineering design ,
<br />administration and relocation
<br /> expenses , due to changes made subsequent to this agreement on the subdivision or development layout or grade .
<br /> f) Provide applicable trenching , backfilling , installation of Company provided conduit and other work in accordance with FPL specifications
<br /> more
<br /> particularly described on Exhibit B attached hereto . At the discretion of FPL , either correct any discrepancies , within two
<br /> (2) working days,
<br /> found in the installation that are inconsistent with the instructions and specifications attached to this agreement or pay the associated
<br /> cost to
<br /> correct the installation within thirty (30) days of receiving the associated bill , and in either case , reimburse FPL for costs
<br /> associated with lost
<br /> crew time due to such discrepancies .
<br /> g ) Provide a meter enclosure , downpipe and ell which meet all applicable codes and FPL specifications and which will accommodate
<br /> FPL's
<br /> service cable size and design . These items must be confirmed with FPL prior to purchase . FPL will not be responsible for costs
<br /> involved in
<br /> modifying or replacing items which do not meet the above criteria .
<br /> 9 . FPL shall :
<br /> a) Provide the Customer with a plan showing the location of all FPL underground facilities , point of delivery,
<br />and transformer locations and
<br /> specifications required by FPL and to be adhered to by the Customer.
<br /> b) Install , own , and maintain the electric distribution facilities up to the designated point of delivery except when otherwise noted .
<br /> c) Request the Customer to participate in a pre-construction conference with the Customer's contractors, the FPL representatives and other
<br /> utilities
<br /> within six (6) weeks of the start of construction . At the pre-construction conference, FPL shall provide the Customer with an estimate
<br /> of the date
<br /> when service may be provided .
<br /> 10 . This Agreement is subject to FPL' s Electric Tariff, including but not limited to the General Rules and Regula tibns1,for,Electric ,
<br />Service and the Rules of
<br /> the Florida Public Service Commission , as they are now written , or as they may be revised , amended ar supplemented. . .
<br /> 11 . This agreement shall inure to the benefit of, and be binding upon , the successors and assigns of the Customer and , FPL. t'
<br /> The Customer and FPL will coordinate closely in fulfilling obligations in order to avoid delays in providing Fgrmanent Vegytric
<br /> serviee :af. the time of the
<br /> Customer's receipt of a certificate of occupancy. w {
<br /> Accepted :
<br /> APA = t
<br /> For FPL (Date) 1 r�
<br /> Pelger D . O ' Bryag, Chairman"" '"'(Date) ` `
<br /> APPROVED AS TO FOAM ,' � o � �o
<br /> AN AL F y i s ( Date)
<br /> _40 .5�7 ?0� �0
<br /> B _ Witness (Date)
<br /> WILLIAM K. DEBRAAL
<br /> DEPUTY COUNTY ATTORNEY
<br />
|