My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-058A
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-058A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:37:15 PM
Creation date
10/1/2015 2:04:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/02/2010
Control Number
2010-058A
Agenda Item Number
8.Q.
Entity Name
Florida Power & Light (FPL)
Subject
Underground distribution Facilities County Parks Maintenance
Supplemental fields
SmeadsoftID
9595
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"Exhibit A" UCD TARIFF ESTIMATE (UCD Tariff Effective: 11 /1312008 ..WR,# .. _. -. ..348120}-.a .��•-.-- •�= ���DhT6�^11F2t112009�'S <br /> PROJECT:1 INDIANRIVER PARKS MAINTENANCEBLDG LOCATIMduit <br /> 77Td . w n g IC <br /> DESIGNER DENNIS PAGANO 1rR U d <br /> # IT CHAR ES REDITS <br /> (13.2.12.a) Primary lateral riser ( if from overhead termination point), pad mounted transformer and trench with ca <br /> not to exceed 150 feet for radials and 300 feet for loops. <br /> From Overhead Termination Point From Existing Underground Termination Point <br /> (13.2.12.a.1 ) Single Phase Radial $944.87 X qty Nu use Loop Price X qty 944.87 <br /> (13.2.12.a.2) Two Phase Radial $2,258.62 X qty NIA Use Loop Prim X qty - <br /> ( 13.2.12.a.3) Three Phase Radial - 150KVA $885.61 X qty NIA Use Loop Prim X qty - <br /> (13.2.12.a.4) Three Phase Radial - 300 KVA $0.00 X qty NIA Use Loop Price X qty <br /> (13.2.12.a.5) Single Phase loop $2,394.99 X qty $1 ,316.90 X qty - <br /> (13.2.12.a.6) Two Phase Loop $4,562.43 X qty $3,125.06 X qty - <br /> (13.2.12.a.7) Three Phase Loop - 150 KVA $6,236.31 X qty $4,738.19 X qty - <br /> (13.2.12.a.7) Three Phase Loop - 300 KVA $3,135.99 X qty $1 ,820.03 X qty - <br /> (13.2.12.b) Secondary riser and lateral, excluding handhole orjunction box, with connection to Applicant's service cables <br /> no greater than 20 feet from Company riser pole. <br /> (13.2.12.b.1 ) Small Single Phase 4I0 TPX or smaller $513.28 X per riser <br /> (13.2.12.b.2) Large Single Phase larger than TPX 5.06 X per riser <br /> (13.2.12.5.3) Small Three Phase 410 OPX or smaller <br /> $70 <br /> 5705.89 X per riser <br /> (13.2.12.b.4) Large Three Phase larger than 410 OPX $19333.83 X per riser <br /> (13.2.12.c) Small UG commercial services (60 Amp 120V 1125 Amp 1201240V per SPO 21010.4) <br /> (13.2.12.c.t .a) 2 wire (120V) service on accessible wood pole $596.66 X per service - <br /> (13.2.12.c.t .b) 3 wire (1201240V) service on accessible wood pole $615.89 X per service - <br /> (13.2.12.c.2.a) 2 wire (120V) service on Inaccessible wood pole $676.85 X per service - <br /> (13.2.12.c.2.b) 3 wire (1201240V) service on Inaccessible wood pole $698.19 X per service <br /> (13.2.12.c.3.a) 2 wire (120V) service on accessible concrete pole $617.79 X per service - <br /> (13.2.12.c.3.b) 3 wire (120124OV) service on accessible concrete pole $637.00 X I 1per service - <br /> (13.2.12A) Handholes and Padmounted Secondary Junction Boxes, excluding connections. <br /> (13.2.12.d.1 ) Handholes <br /> (13.2.12.d.t .a) Small 24" handhole $178.76 X per HH <br /> (13.2.12.d. .b) Intermediate handhole $207.95 X per HH <br /> (13.2.12.d.l .c) Large 48" handhole E725.72 X per HH <br /> (I 3.2.12.d.2) Pad Mounted Junction Box (PM TX Dummy $1 ,582.71 X per box <br /> Cabinet M&S #161 .40000.7) <br /> (I 3.2.12.d.3.a) Pad Mounted Junction Cabinet (22 port $11 ,477.44 X per cabinet <br /> 3 phase cabinet M&S #161-40100-3) <br /> (13.2.12.d.3.b) Tapping conductors (if more than 12 sets) $64.48 X per set <br /> (13.2.12.e) Primary Splice Box including splices and cable pulling set-up <br /> (13.2.12.e.1 ) Single Phase per box $1 ,253.76 X per box <br /> (13.2.12.e.2) Two Phase per box $1 ,763.18 X per box <br /> (13.2.12.e.3) Three Phase per box $1 ,938.57 X per box - <br /> (13.2.12.5) Additional installation charge for underground primary laterals Including trench and cable-in-conduit which exceeds <br /> the limits set in 13.2.12.a to reach FPL designated point of delivery. <br /> (13.2.1211 ) Single Phase per foot $1 .33 X per ft. <br /> (11 <br /> 3.2.12.5.2) Two Phase per foot $3.12 X per ft. <br /> (13.2.1213) Three Phase per foot 53.35 X I 1per it. <br /> (13.2.12.g) Additional installation charge for underground primary laterals including trench and cable-in-conduit extended <br /> beyond the FPL designated point of delivery. <br /> (13.2.12.g.1 ) Single Phase per foot $7.30X per ft. 1 43K00 <br /> (13.2.12.8.2) Two Phase per fool $10.80.8 8 Xperk. <br /> (13.2.12.g.3) Three Phase per foot $12.91 X per it. <br /> (13.2.12.h) UG Feeder <br /> (13.2.12.h) 1000 KCMIL (not including switch package) $12.89 X per ft. <br /> (13.2.12.h) Switch package (913 per package) $21 ,315.92 X each - <br /> (13.2.12.h) Switch package (616 per package) $21 ,315.92 X I jeacn - <br /> (13.2.13.a) Trench and backfilling credits <br /> (13.2.13.a.1 ) Credit per foot of primary trench $2.83 X 5 per ft. 636.75 <br /> (13.2.13.a.2) Credit per foot of secondary trench $2.63 X per ft. - <br /> (13.2.13.b) Conduit installation credits <br /> (13.2.13.b.1 ) Credit per foot of 2" PVC $0.49 X 5 per ft. 110. 25 <br /> (13.2.13.b.2) Credit per foot of 5" PVC $0.68 X per k. - <br /> (13.2.13.c) Handhole I primary splice box installation credits <br /> (13.2.13.c.1 ) Credit per large HH (greater than 30") 1 Pri Splice Box $ 189.11 X �HH(s) <br /> (13.2.13.c.2) Credit per small I intermediate HH (30" or less) $49.71 X HH(s) <br /> (13.2.13.d) Transformer I cap bank pad installation credits <br /> (13.2.13.d.) Credit per pad $29.24 X Opad(s) 29.24 <br /> Feeder Splice Box Credit (FDRSPLICEBOX-07-860) $717.45 X each <br /> Padmount Switch Chamber Credit (FDRSWPAD-07-860) $459.13 X each <br /> Additional Charges (e.g. non-rapid trenching, restoration, etc.) 0 <br /> TOTAL CONTRIBUTION : $ 1 382.87 <br /> LESS TOTAL CREDITS : 776.2 <br /> TOTAL CASH PAYMENT: <br /> TOTAL CUSTOMER PAYMENT 1 ,382.87 <br /> (CONTRIBUTION MAT + LABOR) 776.24 <br /> (Miscellaneous Trench Purchase must be used if credits exceed total contribution amount. Inventory on work request see SPO 21450.2) - <br /> (CONTRIBUTION CASH) 606.63 <br /> 2/2412010 3:18 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.