My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-113
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:22:43 PM
Creation date
10/1/2015 2:37:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
05/17/2011
Control Number
2011-113
Agenda Item Number
8.C.
Entity Name
G.K. Environmental
Subject
Oslo Boat Ramp Amendment No.2 to Work Order No. 1
Area
Oslo Boat Ramp
Project Number
0381
Supplemental fields
SmeadsoftID
9912
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GK Environmental , Inc. <br /> Oslo Road Boat Ramp <br /> Amendment No . 2 to Work Order No . 1 <br /> May 17 , 2011 BCC Agenda <br /> Page 3 of 4 <br /> TOTAL AMENDMENT NO. 2 COST $ 8 , 580 . 00 <br /> NOTE 1 : The above costs include additional GKE staff, boat , fuel , and equipment . <br /> NOTE 2 : If required , following permit application submittal and agency review , GKE will <br /> complete any required additional environmental work / meetings . A separate <br /> amendment will be provided if necessary for any additional environmental permitting <br /> assistance costs and post construction assistance and monitoring . <br /> Services Not Included <br /> The following services / fees are not included ( if required ) in this agreement , but will be <br /> coordinated and reviewed by CONSULTANT : <br /> 1 ) Surveying / engineering <br /> 2 ) Legal work <br /> 3 ) Engineered permit drawings <br /> 4) Water quality " laboratory" analysis ( HBOI ) <br /> COMPENSATION <br /> This section of the AGREEMENT entitled CONSULTANT FEES / COMPENSATION shall be <br /> revised in response to the Scope modifications set out herein . The charges associated with this <br /> AMENDED AGREEMENT are as follow : <br /> Fees for Environmental Services : <br /> Work on TASKS I through XV AS AMENDED ABOVE NOT -TO - EXCEED $ 8 , 580 . 00 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0381B-OSLO BOAT RAMP Phase Il \Admim\Contracts\GK Environmental\OBR <br /> Amendment No 2 to Work Order No 1 4-9- 11 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.